{"id":1210,"date":"2014-11-06T16:16:51","date_gmt":"2014-11-06T22:16:51","guid":{"rendered":"http:\/\/lakedelhi.org\/?p=1210"},"modified":"2014-11-12T16:18:04","modified_gmt":"2014-11-12T22:18:04","slug":"minutes-for-trustee-special-meeting-november-6-2014","status":"publish","type":"post","link":"http:\/\/lakedelhi.org\/?p=1210","title":{"rendered":"Minutes for Trustee Special Meeting &#8211; November 6, 2014"},"content":{"rendered":"<p align=\"CENTER\"><span style=\"font-family: Times New Roman, serif;\">The Combined Lake Delhi Recreational Facility and Water Quality District<\/span><\/p>\n<p lang=\"en-US\" align=\"CENTER\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Board of Trustees Meeting<\/span><\/span><\/span><\/p>\n<p lang=\"en-US\" align=\"CENTER\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Thursday, November 6, 2014 \u2013 6:30 p.m. <\/span><\/span><\/span><\/p>\n<p lang=\"en-US\" align=\"CENTER\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Maquoketa Valley Middle School Conference Room<\/span><\/span><\/span><\/p>\n<p lang=\"en-US\" align=\"CENTER\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Delhi, IA<\/span><\/span><\/span><\/p>\n<p lang=\"en-US\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">The meeting of the Combined Lake Delhi Recreational Facility and Water Quality District Board of Trustees was called to order by President Steve Leonard at 6:33 PM at the Maquoketa Valley Middle School Room. <\/span><\/span><\/span><\/p>\n<p lang=\"en-US\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Trustees present: Kray, Leonard, Burger, Colgan, Davidson<\/span><\/span><\/span><\/p>\n<p lang=\"en-US\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Trustees absent: Gifford and Kramer<\/span><\/span><\/span><\/p>\n<p lang=\"en-US\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Visitors: Diane Bauer, Larry Peter, Ed Schmidt, Don Dede, Pat Dede, Jim Locke, Phyllis Locke, Dave Larson, Chloe Colgan, Larry Aschbrenner, Bob Klima<\/span><\/span><\/span><\/p>\n<p lang=\"en-US\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Agenda was reviewed by Leonard and motion to approve the agenda by Kray, Davidson second.\u00a0 All ayes, motion passed.<\/span><\/span><\/span><\/p>\n<p lang=\"en-US\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Colgan explained that our agreement with Lunda Construction was based on lump sum bidding but if the contractor does work that is not in the contract or may find a different way to complete a task, change orders are created.\u00a0 Change Order #7 from Lunda Construction deals with the dewatering of the cofferdam after our huge water event in June.\u00a0 Both of the upstream and downstream sides of the cofferdam were flooded and it took 3 weeks before work could continue.\u00a0 Leonard made motion to approve Change Order #7 in the amount of $47,403.29, Davidson second.\u00a0 Davidson asked who negotiated.\u00a0 Colgan conferred with Stanley Engineering on this change order and we saved monies by waiting to pay this claim.\u00a0 After the flood, the rest of the construction year had ideal weather and river flow conditions allowing the contractor to recover lost time from the flood\u00a0 All ayes, motion passed.<\/span><\/span><\/span><\/p>\n<p lang=\"en-US\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Change order #9 from Lunda Construction was explained that it is for field modifications that needed to be made to rock anchor rods.\u00a0 Colgan indicated that Stanley Engineering is recommending that we deny this change order as our bid drawings indicated a plus or minus measurement in this area.\u00a0 Leonard made motion to deny Change Order #9 from Lunda Construction, Burger second.\u00a0 Burger asked if Lunda is aware Stanley recommends rejecting the change order and Colgan indicated Lunda is aware.\u00a0 Vote taken on motion to deny change order, all ayes, motion passed.<\/span><\/span><\/span><\/p>\n<p lang=\"en-US\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Colgan explained Change Order #10 from Lunda Construction for $2.776.29 was for concrete work done to cover rock bolts that wasn&#8217;t necessary. Stanley Engineering and Colgan recommend denying the change order. Davidson made motion to deny Change Order #10, Burger second. Leonard asked Colgan if there was any downside risk as to how the contractor completed the work and Colgan said no.\u00a0 All ayes, motion passed.<\/span><\/span><\/span><\/p>\n<p lang=\"en-US\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Change Order #11 is for $8431.72 and was requested by Lunda for a subcontractor.\u00a0 According to our contract if there is a 15% under run on an item, the contractor can request an adjustment.\u00a0 This is based on the amount of grout used under the powerhouse.\u00a0 Davidson made motion to approve, Burger second, all ayes, motion passed. <\/span><\/span><\/span><\/p>\n<p lang=\"en-US\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Change Order #12 is for the lifting beam for the stop logs.\u00a0 Colgan explained that Linita is the flood gate vendor under contract with Lunda Construction.\u00a0 The District supplied the gate lifting mechanisms made by Steel Fab from a previous contract and were shipped to Linita for their inspection and repair if required. Linita must guarantee the operation of the entire mechanical systems in the water passage areas.\u00a0 Linita indicated they could bring the existing beam up to standard for $27,000 or forward us a new beam for approximately $30,000.\u00a0 Stanley Engineering is recommending purchasing the new lifting beam.\u00a0 Leonard made motion to approve Change Order #12 in the amount of $35,815.05, Burger second.\u00a0 There was discussion regarding whether we could scrap the old beams and Colgan indicated he would discuss with Stanley Engineering to see what it is worth.\u00a0 A vote was taken on the motion, all ayes, motion passed.<\/span><\/span><\/span><\/p>\n<p lang=\"en-US\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Public comment \u2013 Before any public comment, Leonard advised that there is a written draft for the Lake Delhi Voice which will include information on the recent governors visit as well as an explanation regarding the declining of the Phase II bids by the board.\u00a0 The lowest bid of the 3 bids came in $1.3 million higher than the estimate.\u00a0 Colgan and Leonard explained there will be some changes made to the bid and we will be requesting a second bidding on Phase II.\u00a0 Colgan feels the time of year will be better suited to construction and will have an impact on cost.\u00a0 <\/span><\/span><\/span><\/p>\n<p lang=\"en-US\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Ed Schmidt asked if our insurance would cover the costs on Change Order # 7 and Burger said our builders risk insurance is not for pumping of water, etc. as it covers equipment that may be damaged.\u00a0 <\/span><\/span><\/span><\/p>\n<p lang=\"en-US\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Dave Larson indicated that the price of scrap just went down to $140\/ton and it may not be worth worrying about scrapping the gates.<\/span><\/span><\/span><\/p>\n<p lang=\"en-US\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Larry Peter asked if Phase II will have stop log items also and Colgan explained that included in the Phase II scope is a new feature called the stop log area that will provide a maintenance opening in the dam located between the existing concrete structure and the new labyrinth overflow spillway.\u00a0 When operated it will allow logs and debris to be flushed down the river when required.\u00a0 This is not to be confused with the stop logs that were a part of the change order.<\/span><\/span><\/span><\/p>\n<p lang=\"en-US\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Jim Locke asked why therewas so much disparity on the bid responses. Colgan said the timing of the work along with the availability of other job opportunities to contractors resulted in a bid offering that was not that appealing to contractors to give the District competitive bids. <\/span><\/span><\/span><\/p>\n<p lang=\"en-US\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Bob Klima thought Phase II had the cofferdams in the bids and Colgan said Phase I has two smaller cofferdams, one upstream and the other downstream to protect Phase I work.\u00a0\u00a0 Phase II has the major cofferdam that is needed to divert the river around the new dike and overflow spillway as well as a second smaller cofferdam to protect the work from river flow on the downstream side.\u00a0 There are a total of 4 cofferdams, two for each phase but the Phase II upstream is the major cofferdam to restore Lake Delhi.<\/span><\/span><\/span><\/p>\n<p lang=\"en-US\"><span style=\"color: #000000;\"><span style=\"font-family: Times New Roman, serif;\"><span style=\"font-size: medium;\">Motion to adjourn by Davidson, Burger second.\u00a0 All ayes, motion passed. Meeting adjourned at 7:18 pm.<\/span><\/span><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Combined Lake Delhi Recreational Facility and Water Quality District Board of Trustees Meeting Thursday, November 6, 2014 \u2013 6:30 p.m. Maquoketa Valley Middle School Conference Room Delhi, IA The meeting of the Combined Lake Delhi Recreational Facility and Water &hellip; <a href=\"http:\/\/lakedelhi.org\/?p=1210\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[1,6],"tags":[],"_links":{"self":[{"href":"http:\/\/lakedelhi.org\/index.php?rest_route=\/wp\/v2\/posts\/1210"}],"collection":[{"href":"http:\/\/lakedelhi.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/lakedelhi.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/lakedelhi.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/lakedelhi.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1210"}],"version-history":[{"count":2,"href":"http:\/\/lakedelhi.org\/index.php?rest_route=\/wp\/v2\/posts\/1210\/revisions"}],"predecessor-version":[{"id":1212,"href":"http:\/\/lakedelhi.org\/index.php?rest_route=\/wp\/v2\/posts\/1210\/revisions\/1212"}],"wp:attachment":[{"href":"http:\/\/lakedelhi.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1210"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/lakedelhi.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1210"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/lakedelhi.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1210"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}