Agenda for Thursday, March 17, 2016

 

The Combined Lake Delhi Recreational Facility and Water Quality District

Thursday, March 17, 2016

6:30 p. m.

Lake Delhi Trustees Administration Building

Delhi, IA

  1. Call to Order
  2. Approve Agenda
  3. Consideration and approval of minutes of Previous Meetings
  4. Consideration and approval of Payments
  5. Review Financial Report
  6. Consideration and possible action on request to Delaware County for reimbursement for invoices paid by the District for the spillway rebuild
  7. Consideration and possible action on Stanley Supplemental Agreement
  8. Consideration and possible action on General Constructors change orders
  9. Consideration and possible action on job descriptions for paid contractors and dam volunteers
  10. Consideration and possible action on payment request from Turtle Creek Road Association
  11. Consideration and possible action on donation request from the LDRA for assistance with the LDRA dredge debt
  12. Consideration and possible action on final agreement with Rocky Nook Association for septic/water lines
  13. Committee Updates – Lake Bed Cleanup, Dredge, Dam Construction, Water Quality, Funding/Finance
  14. Public Comment
  15. Adjourn

 

Minutes from March 3, 2016

The Combined Lake Delhi Recreational Facility and Water Quality District

Board of Trustees Meeting

Thursday, March 3, 2016 – 6:30 p.m.

Lake Delhi Trustees Administration Office

The meeting of the Combined Lake Delhi Recreational Facility and Water Quality District Board of Trustees was called to order by President Steve Leonard at 6:30 PM at Lake Delhi Trustees Administration Office.

Trustees present: Kramer, Davidson, Leonard by phone, Burger by phone

Trustees absent: Colgan, Gifford, Herman

Visitors: Larry Aschenbrenner, Nancy Hurt, Wanda Davidson

Agenda reviewed by Leonard. Motion was made to approve agenda by Davidson, second by Kramer. Motion carried.

The public hearing for the FY 2016/2017 budget was opened. Kramer gave a short overview of the proposed budget noting that our taxable valuation increased by $11,287,112 from last year. Kramer stated that due to the increased valuation, the tax rate for the lake debt service for FY will decrease from $9.10329 to $7.4775. It was also noted that property tax levied from the $4.00/$1000 will increase from $207,926 for FY16 to $253,065 for FY17 due to the increased valuation. With regard to estimated revenues and expenditures, Kramer stated that as the dam project nears completion we will see a drop in our ending balance in FY17. It was also noted that those numbers are estimates.

Kramer asked for any comments from the board or public. Davidson asked a question regarding the LDRA dredge loan. He wondered why the numbers went from $89,455 in FY15 to $72,107 in FY16 and then back up to $81,292 for FY17. Kramer answered that those numbers came from the dredge debt schedule which had been renegotiated in FYY16. Burger said he reviewed the budget and thought it looked good. Kramer noted that the last two pages of the budget were for the District’s debt service schedule. Those numbers are actual numbers and not estimates. Burger noted that the line item expenditures are estimates and the District could over-expend in one area and under-expend in another. What we can’t do is over-expend the total expenditures without amending the budget. Leonard asked for a motion to close the public hearing. Davidson made the motion, Burger second. Motion catrried.

Burger made motion to adopt a resolution to approve the Fiscal Year budget for 2016/2017, Davidson second. Motion carried.

The next agenda item was consideration and possible action on amending the District’s credit card policy. Kramer explained that the policy had been approved at the February meeting but after giving it to Carla Becker, the County Auditor, she felt we needed to change some of the language. Her concern was the language that gave some leeway to purchases made that would allow for payment of sales tax. She suggested removing that language and adding language that if a purchase was made that included sales tax, the Board of Trustees would need to review and approve before payment could be made. Kramer noted that she had had discussions with Burger and Davidson regarding other aspects of the policy but for the sake of getting the credit card application processed in a timely manner she would like a motion to approved the policy as amended. If we need to add or remove individuals currently named on the credit card policy, we can always amend at a later date. Kramer noted that Davidson felt we should use a purchase order system that isn’t addressed in the policy. Kramer said she agreed that we should look at that but also stressed that the credit card is going to be used minimally and that it was needed most to allow Burrington Group to make purchases for items not available locally that will be used for the start-up and maintenance of the dam. Kramer stated that in order to get the credit card application processed it needed to through the County Supervisors. Davidson asked why that was necessary. Kramer explained that because our finances are held by the County, any credit card application would require their approval. Motion was made by Burger, second by Davidson to approve the amended policy and open for further discussion. Burger said he wanted to make sure that since an important part of the credit card is to buy supplies & equipment for the dam we should have the ability to expand the number of credit card holders to Pat Colgan or those who may either work or volunteer at the dam at a later date. He also said we need to make sure we have control over the credit cards and that is the responsibility of the Treasurer. He said he would support approving the amended policy at this time but we should review to make sure we the right people approved to carry the card and would like to review the policy again at another time. Leonard said he agreed that this policy would probably always need to be looked at and reviewed as our needs continue to evolve but that we do need to get the application processed. Davidson commented that there should be a purchase order for anything ordered using the credit card and that it should be attached with the invoice when it’s presented for approval. With no further discussion, Leonard asked for a vote. Motion carried.

Leonard opened the meeting to public comment. Larry Aschbrenner noted that Sunday, March 13th would the the 4th Annual St. Patty’s Day Guest Bartender Event at the Pizza Place. He said he hoped to see as many people from the lake attend and asked that the Trustees send out an email to make people aware that the event was coming up. All tips go to the rebuilding of the dam. The Trustees thanked Larry for his continued support of the Lake.

Motion to adjourn by Davidson, second by Kramer. Motion carried. Meeting adjourned at 7:10 pm.

Agenda for Trustee Meeting – March 3, 2016

The Combined Lake Delhi Recreational Facility and Water Quality District

Thursday, March 3, 2016

6:30 p.m.

Lake Delhi Trustees Administration Building

Delhi, IA

 

  1. Call to Order
  2. Approve Agenda
  3. Open Public Hearing for FY 2016/2017 Budget
  4. Close Public Hearing
  5. Consideration and possible action on FY 2016/2017 Budget
  6. Consideration and possible action on amending current credit card policy
  7. Public Comment
  8. Adjourn

 

 

 

 

Minutes from February 18, 2016

The Combined Lake Delhi Recreational Facility and Water Quality District

Regular Meeting

February 18, 2016

6:30 PM

Lake Delhi Trustees Building

Delhi, IA

 

The regular meeting of the Combined Lake Delhi Recreational Facility and Water Quality District was called to order by President Steve Leonard at 6:28 PM.

Trustees present: Leonard, Kramer, Davidson, Herman, Colgan (Skype), Gifford (phone), Burger (phone)

Trustees absent: None

Visitors: Larry Peter, Eve Peter, Ed Schmidt, Dan Recker, Pat Dede, Don Dede, Chris Stender, Ron Cook, Marcheta Cooey-Lux, Bill Lux, Nancy Hurt, Dan Reyner, Wayne Garvin, Jenny Garvin, Larry Aschbrenner, Bruce Schneider, Margie Schneider

Recording Secretary: Shelley Kallenbach

Herman motioned to approve the agenda as posted and read, seconded by Davidson. Gifford motioned to move Agenda Item 11 to earlier in the meeting to accommodate his schedule. Herman modified his motion to approve the agenda with Agenda Item 11 to the fourth slot and move the remaining agenda items down accordingly, Davidson seconded, Motion approved.

Davidson motioned to approve the January 21, 2016 meeting minutes, Herman seconded, motion approved.

Davidson motioned to reopen the tabled motion regarding Bruce Schneider’s request for reimbursement for sediment removal from the lakebed, Burger seconded.

Individual trustee opinions regarding the motion were heard.

Davidson stated that he has had the opportunity to look at the sites and documentation. He says that ideally this work would have been approached in a different manner, but the sediment removal was still beneficial to everyone on the lake.

Burger seconded Davidson’s opinion and added that sediment removal improves the safety and recreational value of the lake.

Schneider stated that since the last meeting, he has removed another 50 dump truck loads for about another $3,000 worth of work. Most of the work had been done through the summer and fall and he plans on doing more.

Gifford stated that he did not consider whether or not the work done had value, as there was clear value, but that as the project was begun without trustee involvement it didn’t qualify for review. He stated the only portion that would qualify for reimbursement review would be future work that the Trustees would be involved in.

Herman stated that since the last meeting work has been done with definite value to the general boating and recreational value of the lake. He stated he shared Gifford’s concerns, and also has had lake residents contact him that are concerned about opening a “can of worms” regarding reimbursement. He is concerned that there was no prior Board approval and no solid way to measure what work had been done.

Colgan stated that he didn’t doubt there was value to the work completed, but had concerns about the reimbursement. He stated that if this was approved, many more would come forward. He believes there are still 6 to 12 weeks left to finish the dam and money may be required for contingencies. He feels he needs to be accountable for funding to be available if things happen in the future.

Leonard stated that the original intention with the 80%/20% match was to have Board involvement upfront evaluating ideas on criteria including public recreational benefit, improvement to safety, and cost effectiveness. He stated that it is difficult to understand the starting point and current point since the Board was not formally involved in the process from the beginning. He commended the Schneider family for their work. However, there’s no way to know if the work fits the Board’s criteria. He also commended all of the many property owners who have removed dirt with no reimbursement from the Lake District after the DNR/Corp of Engineers/County Engineer approval process. He stated he would strongly support future work based on recreational value, safety, and cost effectiveness, and would evaluate the work with the same heavy debate the other larger projects have received.

Clarification was requested regarding Colgan’s comments on funding. Colgan stated he is concerned about risk and the Board’s criteria for budget control for reimbursement when the dam itself is not finished.

The original motion on the table was for $25,000 reimbursement for Schneiders’ work that had already been done and still has yet to be done. Votes were taken as follows:

Burger: Yes

Gifford: No

Herman: No

Davidson: Yes

Leonard: No

Kramer: Abstain

Colgan: No

Motion does not pass.

Kramer presented payments for approval. Payments in the amount of $2,577.00 from the General Fund for electricity, internet, printer maintenance, lobbyist, and miscellaneous equipment were presented. Payments in the amount of $423,728.79 for Burrington Group, GCI payment, and Stanley engineering services were presented. Herman motioned to approve the payments as read, seconded by Kramer. Concerns about the increasing costs of engineering expenses were expressed. Colgan reviewed the four Stanley Engineering invoices for the month and their appropriateness. Leonard stated that as the project nears completion, Stanley’s engagement is critical with a lot of moving parts coming together with problem solving and advice. Leonard expressed confidence in the services received and the amount billed. Additionally, a question about whether GCI should pick up some of the contract extension bills due to their failure to meet the deadline in the contract. It was confirmed that over 2 million dollars was saved from the contract rebid, and even with additional charges, there is still a major net money difference saved. Motion passed.

Gifford dropped from the meeting.

Kramer presented the financial reports. The General Fund had revenues of $943.64 and expenses of $2,502.06 to end January at $255,669.18. The Debt Service Fund had revenues of $2,156.24 and no expenditures, ending January at $180,293.24. The Dam/Spillway Project Fund had revenues of $439,076.17 from reimbursements and the county, and expenditures of $660,463.50, ending January at #3,470,670.84. Davidson motioned to file the financial reports as read, seconded by Herman, motion approved.

Motion to request reimbursement from Delaware County in the amount of $194,601.27 for expenses paid by the District was made by Herman, seconded Davidson, motion approved.

Discussion was opened on the issue of a credit card for the District. A maximum spending limit has been set by the County at $3,000. The credit card application would be processed through Grundy National Bank. A set of procedures on the use of this credit card was presented. Herman motioned to approve the presented procedures, Davidson seconded. Discussion was opened. Herman added an exception for smaller online purchases in which the tax-exempt paperwork would take more time than it is worth. Stamped inventory and a purchasing log was also discussed. Herman amended his motion to allow purchases of less than $50 total online be exempt from the tax-exempt status if it creates a hardship in regards to placing an order, Davidson seconded, motion approved.

Colgan reviewed GCI Change Order #8 in the amount of $6,683.25. This was presented at the previous meeting but had not yet been adequately reviewed by Stanley Engineering. This change order allows for equipment that would allow the SCADA computer to be located in the LDRA house across the river which has better environment to house this type of equipment computer to the dampness of the concrete powerhouse structure. Burger motioned to approve GCI Change Order #8, Kramer seconded, motion approved.

Colgan presented updates regarding job descriptions for potential future employees of the lake. Colgan states that the District will not be hiring any contractors as direct employees to operate the dam. Personal that will operate the dam that are non-volunteer workers would be hired and managed by Burrington Group. All maintenance work would be a separate contract with Lunda for one to two years.

The potential endorsement of HF2249 by the District was discussed. Leonard stated that a very concerted approach was made regarding getting financial support for Lake Delhi and future watershed management concerns. As this is a growing statewide issue, increased funding is becoming available through the state. However, Iowa requires that only counties and cities are able to be voting members of watershed management authorities.  Our combined District is currently not eligible. HF2249 is a bill currently in place to allow the District to be a voting member of this future watershed management authority. The bill has already passed the committee process. Davidson motioned to formally endorse HF2249 as a District, Kramer seconded. It is unknown at this time what liabilities the District may incur in the future as part of this authority, but each will be reviewed extensively. Motion to endorse HF2249 approved.

The Board heard committee updates.

The Lake Bed Cleanup Committee had no updates.

The Dredge Committee should know the final Lidar mapping from Stanley on the last remaining borings and will forward the data as soon as it is received.

The Dam Construction Committee states that GCI has worked every day except for three or four due to wind chill. Six to eight weeks remain to finish the dam under ideal weather conditions, with parts remaining including a sheet pile wall to prevent water from running around the dam spillway. The downstream side is complete. The weather has been impacting the compaction of clay materials that will be the base for three remaining concrete slabs on grade. Warmer weather, wind, and potentially mixing the clay with lime will allow for drier clay and subsequent slab placement.

The Funding and Finance Committee stated there will be a public hearing March 3rd to review the next fiscal year budget.

Leonard added that within the last week he met with the Iowa DNR and various state representatives in Des Moines for an update on the lake restoration progress and the request to get on the Iowa Public Lakes list. This could allow for increased funding for the lake. There was good communication and support following the meeting.

Public discussion was opened.

Bruce Schneider stated that he feels he was let down by the Board because he was not told to get a bid. Leonard clarified that there were no details on the work done or the estimated cost until the last meeting. Leonard stated that the Board had taken the time to evaluate the cost effectiveness, safety, and risk management of each project proposal on its individual merits, and would continue to do so for any future work, including work performed by Schneider. He stated that with all proposals, the Board had gone through a yes or no process of voting for each project individually. Leonard stated that he is willing to add future work with the Schneiders on the March 3rd meeting agenda if the Schneiders are willing to propose new work. Assuming the board is in agreement with new work, he would contact Randy Rattenborg to come out to complete laser lines for work estimation prior to the work starting.

Larry Peter expressed concerns about matching funds required in a watershed authority regarding property tax increases. It was clarified that any situation where matching funds would require a property tax increase would have to go to the voters. If the general operating funds would be used for matching funding, the Board would make the decision to use or not use it.

A question was raised on if the District would be paying rent to the LDRA for use of the LDRA building for the remote computer access. It was clarified that the District owns the LDRA building.

It was clarified that no liaison is required to be a part of the legislative watershed authority, as the request is for the Board to have a single vote.

A question regarding the location of archaeological sites was raised. It was confirmed that the Board is unaware of any archaeological disturbances, but is bound by the Corps of Engineers not to release the archaeological site locations publicly. However, the Board continues to be mindful of them.

With regard to the 80%/20% projects, it was confirmed that each project had been done differently for silt removal along with being reviewed by the Board under its own individual merits. 100% payment by the road associations had been expected prior to Board reimbursement. A laser requirement will be reviewed on March 3rd as a formal process. Schneider’s future work would be considered but not automatically approved.

Davidson motioned to adjourn, seconded by Herman. Meeting adjourned at 8:25 PM.

Agenda for Trustee Meeting – Thursday, February 18, 2016

 

The Combined Lake Delhi Recreational Facility and Water Quality District

Thursday, February 18, 2016

6:30 p. m.

Lake Delhi Trustees Administration Building

Delhi, IA

  1. Call to Order
  2. Approve Agenda
  3. Consideration and approval of minutes of Previous Meetings
  4. Consideration and approval of Payments
  5. Review Financial Report
  6. Consideration and possible action on request to Delaware County for reimbursement for invoices paid by the District for the spillway rebuild
  7. Consideration and possible action on obtaining a credit card for operational purposes
  8. Consideration and possible action on General Constructors change orders
  9. Consideration and possible action on job descriptions for paid contractors and dam volunteers
  10. Consideration and possible action on endorsement of HF2249, a bill that is being reviewed by the Iowa Legislature to allow our combined 357# Lake District to be a member of the Watershed Management Authorities. Much attention in the State of Iowa for funding purposes is focused on watershed management authorities and only cities and counties are eligible to be members.
  11. Consideration and possible action to reopen a tabled motion regarding a reimbursement request from Bruce Schneider for sediment removal from lake bed
  12. Committee Updates – Lake Bed Cleanup, Dredge, Dam Construction, Water Quality, Funding/Finance
  13. Public Comment
  14. Adjourn

 

Minutes from January 21, 2016

The Combined Lake Delhi Recreational Facility and Water Quality District

Regular Meeting

Thursday, January 21, 2016

6:30 PM

Lake Delhi Trustees Administration Building

Delhi, IA

The regular meeting of the Combined Lake Delhi Recreational Facility and Water Quality District was called to order by President Steve Leonard at 6:30 pm.

Trustees present: Leonard, Gifford, Burger, Kramer, Davidson, Herman, Colgan (via Skype)

Trustees absent: None

Recording secretary: Shelley Kallenbach

Visitors: Larry Peter, Eve Peter, Donald Dede, Becky Willey, Jim Willey, Ed Schmidt, Margie Schneider, Bruce Schneider, Randy Rattenborg, Jason Wenger, Dave Larson, Ben Pasker, Bill Lux, Marcheta Lux

Motion to approve the agenda as posted made by Davidson, seconded by Burger, motion approved.

Motion to approve the December 17, 2015 meeting minutes made by Burger, seconded by Gifford, motion approved.

Kramer presented payments for approval. Payments in the amount of $2,672.26 for electricity, printer maintenance, warrants, lobbyist, salt and sand, and internet were presented from the General Fund. Payments in the amount of $660,463.50

for dam operations, Phase 2 and Phase 1 payments, and engineering services were presented from the Dam/Spillway Project Fund. Motion to approve payments as read was made by Burger, seconded by Gifford, motion approved.

Kramer read the financial reports through December 31, 2015. The General Fund had revenues of $4,814.86 from the county and interest, and expenditures of $3,568.38 from approved miscellaneous payments, ending December at $257,397.70. The Debt Service Fund had revenues of $6,539.62 from the county and interest, and no expenditures, ending December at $178,137.00. The Dam/Spillway Project Fund had revenues of $1,245,412.59 from county, community fund, and LDRA revenues, and expenditures of $445,412.45 for Phase 2, engineering, and contracted services, ending December at $3,692,058.17. Motion to receive and file the financial reports made by Burger, seconded by Herman, motion approved.

Motion to request reimbursement in the amount of $299,681.95 from Delaware County made by Herman, seconded by Gifford, motion approved.

Motion to request reimbursement in the amount of $350,530.55 from the Community Fund to Rebuild Lake Delhi made by Davidson, seconded by Gifford. The Community Fund will have approximately $60,000 left in it after this requested draw. Motion approved.

Motion to approve Thursday, March 3rd at the Administrative Building at 6:30 PM for a public hearing to approve the FY 2016/2017 budget was made by Burger, seconded by Gifford, motion approved.

The Board considered possible action on a proposal from Dubuque Fire Equipment for equipment needed for dam operations. Dubuque Fire Equipment was recommended to assist with finding necessary fire protection equipment for the dam. A walkthrough was conducted, and DFE provided an itemization of what is needed and pricing. Their recommendation for equipment came to a cost of $2,614.00. Colgan advised that he believed this was an appropriate recommendation. Motion to approve the proposal from DFE as read made by Herman, seconded by Burger. The proposal does not include regular maintenance, which is a nominal fee. Motion approved.

Motion to table discussion on a possible credit card for operational purposes until an example policy can be obtained made by Burger, seconded by Gifford, motion approved.

Change Order #7 was canceled. Colgan presented GCI Change Order #8. which is the equipment required to allow the SCADA computer to be installed in the LDRA building across the river from the concrete powerhouse. The control room where the computer was to be placed has environmental problems including high humidity. An alternative location was recommended to eliminate the need to make major modifications to the control room to improve the environment. Part of the benefit of the SCADA system is to allow JetCo to remotely reprogramming of the PLC. Change Order #8 is for the purchase and placement of this equipment to allow the SCADA computer to be located across the river in the LDRA building. Kramer motioned to table discussion on Change Order #8 until further information is obtained, seconded by Herman, motion approved.

The Board discussed the need for a job description for paid contractors and dam volunteers. The operating plan has the dam operations automated 85% of the time with daily inspections made by volunteers. However, for the other 15%, trained operators would be needed during gate movement, etc. This group of people would also be responsible for upkeep, maintenance, buoys, etc. A meeting with Burrington Group is scheduled to discuss this subject. Motion to table discussion on a job description made by Burger, seconded by Davidson. It was emphasized that it is important to clarify the job responsibilities of a contractor versus an employee for legal purposes. Motion to table approved.

The Board heard Bruce Schneider’s proposal for reimbursement for sediment removal from the lakebed. Schneider presented a letter detailing his proposal. His first proposal had been for an 80% cost share for $25,680 for the 6,420 cubic yards of material he has removed since 2014. Since this proposal was made in October of 2015, he has removed an additional 2,938 cubic yards of sediment at an estimated cost of $14,700. He proposes a reimbursement of $25,000, with the remainder and any further work donated by himself, to cover fuel and machinery costs.

Burger motioned to approve a $25,000 reimbursement to Schneider for this and future dredging, seconded by Davidson.

Discussion was opened on the proposal. The sediment location removal was originally driven by the search for black dirt for the Schneider family farm, and it removed approximately 75 to 100 feet out toward the lakebed to create about 6 feet deep of water near Schmidt’s cove. Concerns about the recreational value of this dredging were raised. The benefit of sediment removal for future dredging requirements was reiterated. Concerns about opening up reimbursements for dredging work completed in 2014 or earlier by private individuals was raised, as well as concerns about reimbursement for work that may or may not happen. The original state of dredging with the October proposal was visited and seen by Leonard, Herman, and Davidson, but the additional work has not been seen.

A roll call of concerns to be addressed prior to approval was made.

Leonard commented that he appreciated Bruce removing dirt and silt from the Lake for the potential benefit of many.   He stated he wanted to look at the updated work prior to making a recommendation, as well as the goals and plans for going forward. He stated that he wished they had brought a plan to the board before doing any work as it is difficult to understand what specific benefits there is to this proposed reimbursement project. Reminding everyone that safety, public recreational benefit, and cost effectiveness needs to be considered and the only way to do that was to have the board involved since inception. He wants to do his due diligence to see the benefits to the lake prior committing anything to be fiscally responsible to taxpayers.

The Schneiders’ commented that they don’t expect to keep working for free without having an agreement in place to get paid.   Leonard said that anything going forward should be agreed to by the District board with all appropriate District criteria considered if reimbursement is to be requested.

Colgan says there is a benefit to the sediment removal and the amount requested is fair, but wants to see more detail prior to approval.

Kramer agreed with Colgan that removal of sediment is a benefit to the lake but expressed concern that there was no Trustee oversight on this project.

Gifford explained that he is having difficulty determining what the value of what Schneider did because he does not know the before and after depths, or dimensions of the area where sediment was removed.

Gifford wants to know how deep it was in this location prior to sediment removal, and how deep it is now.  He also asked if any sand was removed besides the black direct.  Schneider responded that he didn’t take the sand because it had no value.

Gifford then asked Schneider if his project was profitable and beneficial, explaining he is assuming it was or why would Schneider proceed with it.  Schneider responded that it was profitable and beneficial to him.

“Herman indicated a desire to be able to explain, in detail, to anyone that asked the reasons that the Board approved a cost share on any given project.  In order to do so, Herman wanted to have a quantification of material to be removed or that has been removed, especially if the Board were to consider the approval of a prior removal from 2014.  Herman also indicated that the use of prior and subsequent LIDAR data would be beneficial.”

Motion to table the motion made by Burger was made by Herman to allow board members to take a closer look, seconded by Gifford. Votes tabled as follows:

Leonard: Yay

Gifford: Yay

Kramer: Yay

Herman: Yay

Burger: Nay, because he feels it is time to approve this particular request.

Davidson: Nay, because he feels that this is an incredible deal.

Motion approved; discussion on a possible Schneider reimbursement tabled until the February meeting.

The Board heard committee updates.

The Lake Bed Cleanup Committee had no updates.

The Dredge Committee will be having a work session soon to work on the going-forward strategy for dredging and a vision for sediment maintenance.

The Dam Construction Committee says that GCI has stuck with it every day in January that work was possible. Next week work will be to construct one of the inclined slabs on grade and will include placing the granular fill, installing rebar, and concrete pouring on Thursday or Friday of next week. He applauds GCI for working through tough situations and not asking for additional funds.

The Water Quality Committee is tackling many water quality issues and also pursuing a Rockwell grant. Work on these water quality issue will be discussed at the upcoming planning meeting.

The Funding/Finance Committee had no updates. Burger complimented Kramer on her solid work on the presented budget.

Herman updated the Board that he has received a petition for a declaratory judgment as discussed in previous meetings and is working on filling in the blanks. He is also working on a FEMA quarterly report.

There was no public comment.

Davidson motioned to adjourn, seconded by Gifford. The meeting adjourned at 8:21 pm.

Agenda for Trustee Meeting – January 21, 2016

 

The Combined Lake Delhi Recreational Facility and Water Quality District

Thursday, January 21, 2016

6:30 p. m.

Lake Delhi Trustees Administration Building

Delhi, IA 52223

  1. Call to Order
  2. Approve Agenda
  3. Consideration and approval of minutes of Previous Meetings
  4. Consideration and approval of Payments
  5. Review Financial Report
  6. Consideration and possible action on request to Delaware County for reimbursement for invoices paid by the District for the spillway rebuild
  7. Consideration and possible action on request to the Community Fund to Rebuild Lake Delhi for reimbursement for invoices paid by the District for the dam rebuild
  8. Consderation and possible action on establishing a date for a public hearing to approve the FY 2016/2017 budget
  9. Consideration and possible action on proposal from Dubuque Fire Equipment for equipment needed for dam operations
  10. Consideration and possible action on obtaining a credit card for operational purposes
  11. Consideration and possible action on General Constructors change orders
  12. Consideration and possible action on job descriptions for paid contractors and dam volunteers
  13. Consideration and possible action regarding a reimbursement request from Bruce Schneider for sediment removal from lake bed
  14. Committee Updates – Lake Bed Cleanup, Dredge, Dam Construction, Water Quality, Funding/Finance
  15. Public Comment
  16. Adjourn

Minutes from 12.17.15

The Combined Lake Delhi Recreational Facility and Water Quality District Board of Trustees

Regular Meeting

Thursday, December 17, 2015

6:30 PM

Lake Delhi Administration Building

Delhi, IA

The regular meeting of the Combined Lake Delhi Recreational Facility and Water Quality District Board of Trustees was called to order by President Steve Leonard at 6:35 PM.

 

Trustees present: Leonard, Gifford, Burger, Kramer, Herman, Colgan, and Davidson (arrived later)

Trustees absent: None

Recording secretary: Shelley Kallenbach

Visitors present: Larry Peter, Eve Peter, Pat Dede, Don Dede, Sara Millhouse, Dave Larson, Chloe Colgan, Brock Lorren, Chip Hughs, Jim Locke, Ben Pasker, Randy Rattenborg, Larry Aschbrenner, Marcheta Cooey-Lux

 

Motion to approve the agenda as read with the addition of consideration and possible action on GCI Change Order #2 was made by Colgan, seconded by Gifford, motion approved.

 

Motion to approve the November 19, 2015 meeting minutes as posted made by Burger, seconded by Herman, motion approved.

 

Kramer presented payments for approval. Claims in the amount of $3,090.97 from the General Fund for electricity, maintenance, clerical services, lobbyist services, printer cartridges, and furnace inspection were presented. Claims in the amount of $445,889.76 for powerhouse painting, dam operations, Phase 2 payment, engineering services, and diesel fuel were made from the Dam/Spillway Project Fund. Motion to approve payments as read was made by Herman, seconded by Gifford, motion approved.

 

Motion to approve a request to Delaware County for reimbursement for invoices paid by the District for the spillway rebuild in the amount of $218,267.27 was made by Herman, seconded by Burger, motion approved.

 

Motion to approve a request to the Community Fund to Rebuild Lake Delhi for reimbursement for invoices paid by the District for the dam rebuild in the amount of $218,738.43 was made by Burger, seconded by Gifford, motion approved.

 

Kramer presented the financial reports. The General Fund had revenues of $4,186.43 from Delaware County, and expenditures of $2,506.13 for miscellaneous expenses, ending the month at $256,151.22. The Debt Service Fund had revenues of $9,575.53 from Delaware County and expenditures of $115,323.75 for an interest payment, ending the month at $171,597.38. The Dam/Spillway Project Fund had revenues of $2,504.12 from interest and expenditures of $533,654.10 for Phase 1, Phase 2, and engineering payments, ending the month at $2,892,058.03.

 

Leonard and Kramer presented a high-level projected budget summary for the dam reconstruction. The projected budget estimates the total cost, including all planned and foreseen costs, at approximately $15,861,393, and total funding for the project estimated at $16,451,400.10. Therefore, barring significant additional unforeseen expenditures, the dam should be rebuilt with an excess of funding of approximately $590,007.10 remaining.

 

Motion to file the financial reports and projected budget summary as presented was made by Colgan, seconded by Herman, motion approved.

 

The Board considered possible action on Stanley Supplemental Agreement #34. This supplemental agreement had been made months ago for Stanley to evaluate dredging and siltation trap options in the amount of $17,100. However, formal approval of the supplemental agreement was not made, though the work is complete and paid for. Motion to formally approve Stanley Supplemental Agreement #34 was made by Herman, seconded by Kramer, motion approved.

 

The Board considered possible action on Stanley Supplemental Agreement #39 in the amount of $90,000. This is to extend the time for the Stanley contractor to work on site to monitor day-to-day operations and answer technical questions, as well as office work and Stanley negotiation with contractors regarding change orders. The extension would be through February 1st, 2016, and is necessary due to the construction delay after the June cofferdam breach. Burger motioned to approve Stanley Supplemental Agreement #39, Kramer seconded. It was confirmed that the Board’s contract with GCI does not place this cost on GCI for delays attributed to them, though it was a major point of discussion in the rebid for Phase 2, but that this will be the only cost to the Board for the delay in comparison to GCI’s significant costs. Motion approved.

 

The Board considered possible action on GCI Change Orders #2 through #6.

 

GCI Change Order #2 is related to the decision to reuse the gate actuators in the current project. This presented a significant cost savings. However, the actuators’ electricity wiring needed to be updated to allow GCI to work with them. This updated change order is in the amount of $9,000. Herman motioned to approve, Burger seconded, motion approved.

 

GCI Change Order #3 is for work completed on the upstream buttress. As the wing wall was not on bedrock, the wing wall had to be sealed beneath the footing to prevent water from seeping into the upstream buttress. With Stanley’s negotiation, this change order is in the amount of $39,000. Kramer motioned to approve, Herman seconded, motion approved.

 

GCI Change Order #4 completed the same work as Change Order #3, only on the downstream buttress. With Stanley’s negotiation, Change Order #4 is in the amount of $9,000. Herman motioned to approve, Burger seconded, motion approved.

 

GCI Change Order #5 is in reference to work that was required following the June cofferdam failure. A clay core wall was required to be placed on the river floor to reinforce the cofferdam, which therefore doubled the amount of earthen material necessary to remove. This resulted in a unit price adjustment based on the amount of material removed, as well as testing for the new levels of clay that were not previously mapped by the 2011 borings. This change order is in the amount of $79,000, and the Board is contractually obligated to this cost. Herman motioned to approve Change Order #5, Kramer seconded, motion approved.

 

GCI Change Order #6 currently has no cost impact to the Board. Additional concrete costs are shared 50/50 between GCI and the Board up to the end of the year. The delay due to the June cofferdam breach has extended the timeframe for concrete pours. However, since the weather has so far been warm, there have been no additional costs to share. If there are costs before December 31st, those costs will be shared 50/50. Burger motioned to approve, Gifford seconded, motion approved.

 

The Board received and filed proposals for painting the powerhouse. The Board sought proposals for salt blast cleaning and repainting the powerhouse to allow for installation of cabinetry, electronics, etc. The Board received two bids, including one from Pospisil Painting for $27,410, and one from Allen’s Painting for $3,400. The Trustees have a resolution allowing the Board President and Treasurer to approve expenditures up to $5,000 before Board approval, and so the Allen Painting bid was selected and used. The powerhouse has now been saltblasted and painted. Burger motioned to receive and file the bids from Allen’s Painting and Pospisil Painting, and to approve the Allen’s Painting bid, Gifford seconded, motion approved.

 

The Board considered establishing credit accounts with Delhi Lumber, Palmer Hardware, and Norby’s Farm and Fleet for small purchases necessary for dam operations. A need was expressed for accounts to allow for purchases of miscellaneous items such as snowblowers, salt, etc. necessary for operators to use on the dam on short notice. Burger motioned to establish credit accounts with Delhi Lumber, Palmer Hardware, and Norby’s Farm and Fleet with a limit of up to $500 per purchase with a list of all authorized chargers and to require signoff for purchase from a trustee, Davidson seconded, motion approved.

 

The Board discussed the need to consider a credit card account for operational purposes. The Board may need to purchase larger items or items that cannot be found locally for dam operations, so a credit card would be useful. It was agreed that this would be a good idea and that options should be considered. Herman motioned to table action on a credit card until the January meeting, Burger seconded, motion approved.

 

The Board considered possible action on a small committee to investigate the transition of the Maquoketa River Water Quality Team’s mission and duties to the Board. Over recent years, the Maquoketa River Water Quality Team (MRWQT) has been overseeing water quality, including septic maintenance, erosion control, bacteria testing, and public information. The MRWQT is seeking to transfer these responsibilities over to the Board along with remaining funds earmarked to be used for encouraging people to maintain water quality. It was discussed that water quality is a very large issue with many subsections, and a small committee is needed to determine these subsections and begin the process of focusing and researching water quality for Board recommendations on an action plan. Disappointment on the loss of knowledgeable voices from the MRWQT was expressed. Herman motioned to create a small committee with not to exceed 3 trustees and not to exceed 3 volunteer members of the public if available to create recommendations and thoughts on how the Board should proceed from a water quality standpoint, Gifford seconded, motion approved. Interested trustee members were solicited. Leonard, Gifford, and Davidson expressed interest in participation.

 

The Board heard committee updates.

 

Leonard presented updates from the Water Quality committee. The Board was represented at meetings for a large Watershed Management Authority encompassing Maquoketa River stakeholders. The Board was instrumental in beginning this process. It is seeking an agreement between political subdivisions to assess water quality and flood risk, develop partnerships and leverage resources. 28 participants were present at the meeting, including counties, conservation departments, the NRCS, and others. They are seeking to draft a 28E agreement to commit to water quality importance, especially in light of recent legal actions taken in Des Moines against authorities for water quality-related complaints. More will be coming in the next month or two.

 

The Lake Bed Cleanup committee stated that a significant amount of debris was lost following heavy rains the past week. This was a big plus for the lake.

 

The Dredging Committee is seeking ways to stop siltation from getting downstream into the lake, and a great way to do that would be to have a siltation trap near the dredge disposal site as recommended by Stanley Engineering. The Committee has found a firm in Iowa to give an estimate for such a project at $1.8 to $2 million in a 20-acre area.  A final amount would be determined by the board going out to bid.  If this is deemed to be an important project by the board, we will need to continue to raise money.  Fund raising will be critical to the success of a sedimentation trap.

 

The Dam Construction Committee presented updates. A major flood occurred this past week, including 3 inches of rain last Sunday. The flow rose to 4200 cfs. The flood gates had been in a position to protect the downstream cofferdam, but with the rain, it became necessary to protect the entire site from flooding upstream. The contractors were given enough time to remove their equipment successfully downstream before the gates were opened to release the water. The downstream cofferdam was lost, but it would not have been needed within a week anyway. The workers were back to work by Tuesday working on the top portion of the dam. Only one day was lost. Remaining work includes 3 slabs on grade, 3 wall pours, and the labyrinth spillway.

 

The Funding/Finance Committee and Legislative Committee had no updates.

 

The floor was opened for public comment.

 

Confusion about change orders was expressed. It was explained that the original contract with GCI was for $6.1 million, and change orders cover changes to the contract due to site conditions. The plan and the costs will come out very close.

 

It was expressed that when considering dredge costs, the cost to remove material is often overlooked.

 

It was stated that in 13 days, the DNR goes to the appropriations committee to ask for watershed area funding, but Lake Delhi doesn’t qualify due to the ratios used to meet the criteria. It was asked how to change criteria to increase funding. The Board stated that this is not the sole determiner of yearly funding, and also that the creation of this watershed authority may impact funding opportunities in the future.

 

Burger motioned to adjourn, Herman seconded, meeting adjourned at 8:30 PM.

Agenda for Trustee Meeting – December 17, 2015

The Combined Lake Delhi Recreational Facility and Water Quality District

Thursday, December 17, 2015

6:30 p.m.

Lake Delhi Trustees Administration Building

Delhi, IA

 

  1. Call to Order
  2. Approve Agenda
  3. Consideration and approval of minutes of Previous Meetings
  4. Consideration and approval of Payments
  5. Consideration and possible action on request to Delaware County for reimbursement for invoices paid by the District for the spillway rebuild
  6. Consideration and possible action on request to the Community Fund to Rebuild Lake Delhi for reimbursement for invoices paid by the District for the dam rebuild
  7. Review Financial Reports & Projected Budget
  8. Consideration and possible action on Stanley Supplemental Agreement #34
  9. Consideration and possible action on Stanley Supplemental Agreement #39
  10. Consideration and possible action on GCI Change Orders #3, #4, #5, and #6
  11. Receive and file proposals for painting of the powerhouse with confirmed quote from Allen’s Painting as approved by the President & Treasurer
  12. Consideration and possible action to approve establishing accounts with Delhi Lumber, Palmer Hardware and Norby’s Farm Fleet for purchases up to $500 for supplies/materials needed for dam operations
  13. Consideration and possible action on obtaining a credit card for operational purposes
  14. Consideration and possible action on assigning a small committee to investigate the transition of the Maquoketa River Water Quality Team’s mission and duties to the Lake Delhi Board of Trustees with a formal request for action to be taken at a later date
  15. Committee Updates – Lake Bed Cleanup, Dredge, Dam Construction, Water Quality, Funding/Finance, Legislative
  16. Public Comment
  17. Adjourn

Minutes from 11/19/15

The Combined Lake Delhi Recreational Facility and Water Quality District Board of Trustees

Regular Meeting

November 19, 2015

6:30 PM
Lake Delhi Trustees Administration Building

Delhi, IA

 

The regular meeting of the Combined Lake Delhi Recreational Facility and Water Quality District Board of Trustees was called to order by Vice President Todd Gifford at 6:32 PM.

Trustees present: Gifford, Davidson, Burger, Colgan, Kramer, Herman, Leonard (by phone)

Trustees absent: None

Recording secretary: Shelley Kallenbach

Visitors present: Larry Peter, Eve Peter, Ed Schmidt, Jim Locke, Becky Willey, Jim Willey, Don Dede, Pat Dede

Motion to approve the posted agenda as read was made by Herman, seconded by Davidson, motion approved.

Motion to approve the October 15, 2015 and November 4, 2015 meeting minutes was made by Burger, seconded by Herman, motion approved.

Kramer presented payment claims for approval. From the General Fund, a total of $2,256.13 for electricity, lobbyist, and furnace inspection expenses was presented. From the Debt Service Fund, a total of $421,312.43 for payments to GCI and Stanley Consultants was presented. Herman motioned to approve the payments as read, Colgan seconded, motion approved.

Motion to approve a request to Delaware County for reimbursement for invoices paid by the District for the spillway rebuild in the amount of $208,137.59 made by Burger, seconded by Davidson, motion approved.

Motion to approve a request to the Community Fund to Rebuild Lake Delhi for reimbursement for invoices paid by the District for the dam rebuild in the amount of $188,796.70 was made by Colgan, seconded by Davidson. A rough estimate of the balance remaining in this fund was requested. It was estimated to have $700,000 remaining after this request. Motion approved.

Motion to approve a request to the Lake Delhi Recreation Association for reimbursement for invoices paid by the District for the dam rebuild in the amount of $22,967.14 was made by Colgan, seconded by Herman. It was confirmed that these are donations that were made after the breech designated for the dam rebuild, and it includes the full balance of the account. Motion approved.

Kramer read the financial reports. The General Fund had revenues of $14,326.63 from Delaware County and interest, and expenditures of $32,634.93 for LDRA donations, miscellaneous expenses already approved, and the Turtle Creek West/Linden Acres cost-share, ending October at $254,470.92. The Debt Service Fund had revenues of $32,601.22 from Delaware County and no expenditures, ending October at $277,345.60. The Dam/Spillway Project Fund had revenues of $1,059,239.66 from Delaware County, the DNR, and the Community Fund to Rebuild Lake Delhi, and expenditures of $1,281,901.03 for Phase 2 payments and engineering payments, ending October at $3,423,208.01. Burger motioned to file the financial reports as read, seconded by Herman. A rough estimate of the dam rebuild costs once finished was made at approximately 15.1 million, and a rough estimate of funds remaining after the rebuild was made at approximately $400,000. It was confirmed that a draft of a high-level summary of project cost totals and remaining balances has been made and a finished product will be available at the next meeting. Motion approved.

The Board considered possible action on filing a Declaratory Judgment action related to the dredge site. This has to do with the need to transfer the lake dredge site from the LDRA to the District as required by FEMA. The owner of the land has the right of first refusal in the event of a resale and desires to exercise this right regarding the transfer. It is the Board’s opinion that this transfer is not a resale, and negotiations to this effect with the owner have been unsuccessful. A Declaratory Judgment would be a civil action and the legal costs associated with it would depend on the owners’ response to it. However, the district stands to lose money from FEMA if this transfer does not occur, it is in the Districts best interest to pursue the issue. Herman motioned to hire the attorney that has assisted the District in the past to file a Declaratory Judgment that the owners’ right of first refusal does not apply to the transfer of the dredge site from the LDRA to the District, seconded by Colgan. It was confirmed that if the judge rules in favor of the owners, the District will not be responsible for the owners’ legal fees per Iowa law. It was stated that FEMA has been cooperative in waiting for a resolution to this situation, but as all attempts have been unsuccessful, it is necessary to issue this judgment to keep the process moving in the case. Motion approved.

The Board considered possible action on a matching request from Turtle Creek Cove.

Dan Reyner presented the Turtle Creek Cove project proposal. The proposal currently presented to the Board is a project that would dredge the cove to a depth of 8 feet, totaling an estimated 10,000 cubic yards of material at $6.50 per cubic yard, as well as create a sediment trap at the entrance to the Cove to prevent sediment from the creek from entering the lake. The seventeen property owners involved in this proposal are willing to contribute $1,200 each to the project as their 20% of the project and request the Board to match the project at 80%. The Cove also proposes that the Board take over maintenance of the sediment trap. Reducing the dredge to 6 feet would make the project costs approximately $60,000 as another landowner is willing to take much of the sand for an existing private project. It is the Cove’s opinion that the Cove should be considered a sediment trap, and the proposed project would present considerable sediment reduction and management for the entire lake.

Colgan motioned to enter into discussion regarding the proposal, Davidson seconded. Discussion was opened.

General thanks to the Turtle Creek Cove for the work to present this proposal and unify so many property owners. It was agreed that the Board was in favor of the sediment trap as it relates to preventing sediment from entering the lake, assuming appropriate easements and rights to reach the trap, as it would benefit all residents. The isolated cost of creating just the sediment trap was identified to be $25,000.

Leonard expressed the opinion that though some may consider this a private cove, the Board should support efforts at siltation control at a lower price than what would be possible after lake fill, which would save taxpayer funds in the future. Others expressed concerns about the dredging portion of the project beyond what is required for the siltation trap only as being an expense that does not benefit the entire lake. Others believed that in return for the Cove’s cooperation on building the sediment trap, the Board should also do something for the Cove itself. Reyner expressed the opinion that the Cove itself is a sediment trap for the entire lake in reference to a 50-year or 100-year weather event, and as such dredging of the Cove would benefit the entire lake. It was confirmed that the lake has been dredged in the past, and that dredging in 2005 included the coves.

Herman motioned that the District contribute a sum not to exceed $40,000 to the Turtle Creek Cove proposed project, paying for the sediment trap first, with the remaining balance to contribute to Cove dredging upon the conditions that the residents contribute $1,200 each and the necessary easements for the District to clean out the sediment traps as necessary, Davidson seconded.

Several board members disliked the percentage split for this motion at 33%. Herman believed that the percentages should be different because the project has greater benefits to the residents of the Cove than to the residents of the entire lake. Leonard stated he wanted to see an 80-20% cost share.

A vote was held regarding Herman’s motion. Votes were tallied as follows:

 

Colgan: No

Burger: Yes

Davidson: Yes

Herman: Yes

Gifford: Yes

Kramer: No

Leonard: No

Motion approved.

Reynar was asked his opinion regarding the residents’ willingness to accept this proposal. Reynar stated that the residents would not be interested in the project with these terms at a 33% cost share when the difference is $8,000.

Burger stated that other dredge projects at the 80-20% split added to the recreational and safety value of the lake, and he does not feel that is the case in the Cove.

Colgan motioned for a project total not to exceed $60,000 that would cover the sediment trap first to a depth of 8 to 10 feet, then go toward other Cove dredging at their discretion, bearing in mind that 4-5 feet is sufficient for recreational boating, with the project at an 80-20% split with the Cove residents, Kramer seconded. Jim Willey from the public requested that the Board do an 80-20% split and pay for the sediment trap.

Colgan amended his motion to be a 80-20% split project not to exceed $50,000 paying for the sediment trap first followed by dredging of the Cove with the expectation of appropriate easements for the Board to access and maintain the sediment trap, Leonard seconded. Individual votes tallied as all yeses, motion passed.

Herman rescinded his original motion, Kramer seconded, all approved, motion rescinded.

The Board considered possible action on Bruce Schneider’s matching request in the amount of $32,100. This is for a dredge project that has already been completed and yet to be done.

Davidson motioned for a funded amount not to exceed $30,000 for work completed and work yet to be done using an 80-20% split, Herman seconded.

It was agreed that the work remaining for this dredge project amounts to approximately 4,000 cubic yards of sediment in order to create an average of between 7 to 12 feet depth. Concern was expressed regarding the recreational and safety benefits for this project, as well as the fact that it is asking for reimbursement after the fact, which sets a new precedent. A desire for additional sediment amount measurements by Lidar was expressed.

Davidson amended his motion to table possible action on Bruce Schneider’s matching request until more information can be obtained by Lidar, Herman seconded, motion approved.

The Hartwick West project was not yet prepared to present regarding their project match request. Burger motioned to table the Hartwick West project, Kramer seconded, motion approved.

The Board considered possible action on the North Beach cleanup and stump removal. This area has had some mechanical and hands-on cutting, but there are still a great deal of willow stumps that will be a significant safety hazard once the lake fills as the water will only go 2 feet above them. An estimate of $1,500 to remove the stumps has been obtained, assuming the ability to use non-asphalt roads to travel to the site.

Herman motioned to approve project funding not to exceed $2,000 for North Beach cleanup and stump removal if the Board can get agreeable access to the site location, Leonard seconded, motion approved.

The Board heard committee updates.

The Lake Bed Cleanup Committee had a hand-cutting day a few weekends ago in areas that are not machine accessible. It was very successful, and appreciation was expressed to those who came and helped. Cleanup is going very well with only a few small pockets remaining.

The Dredge Committee recognized a property owner who has done shoreline work and removed 200 dump trucks of sediment from the lake at his own expense and at no cost to the community.

The Dam Construction Committee states that construction is ongoing 6 days a week with lights to work into the evening. GCI will only take one day off for Thanksgiving, one and a half for Christmas, and one for New Year’s Day. The stop log hoists have arrived and will soon be placed. The emergency diesel generator will be started on December 14th. Colgan estimates the project completion date to be in January.

The Water Quality Committee has sent in a packet of information with proposed thoughts regarding a water quality initiative going forward, which will be reviewed and looked at in more depth in the coming month. The Board is going down the path of creating the Maquoketa River Watershed Management Authority in cooperation with many different stakeholders along the Maquoketa River to create agreements for high water quality.  This Authority would help water quality to be a more connected effort and not just a “Lake Delhi” effort. Lobbyists will be engaged next session for funding regarding the Authority.

The Funding/Finance Committee had no updates.

The Legislative Committee had no updates.

The floor was opened for public comment.

Ed Schmidt asked what the large white x’s in his fields were. It was confirmed that those were for spotting for the upcoming flyover mapping.

Jim Willey stated that there is information regarding 5 feet being the appropriate depth range for recreational boating and believes the Board should not pay for dredging beyond that. He stated that the Board needs to be fair to all taxpayers and consider what has been done in the past.

Larry Peter stated that if the Board opens up cost shares to retroactive projects, it will be a bad precedent. He also asked regarding easements to put lines across the dredge site property should it be transferred to the District, and it was confirmed there is a legal easement for the pipeline and outflow.

Jim Willey stated he remembered there being language that said the dredge site could be transferred between organization types. Such language has not yet been found, and it was suggested to look into past meeting minutes.

No further public comment.

Davidson motioned to adjourn, Kramer seconded, meeting adjourned at 9:02 PM.