Minutes – January 19, 2017

The Lake Delhi Combined Recreational Facility and Water Quality District

Regular Meeting

Thursday, January 19, 2017

6:30 pm

Lake Delhi Trustees Administration Building

Delhi, IA

 

The regular meeting of the Lake Delhi Combined Recreational Facility and Water Quality District was called to order by Trustee Larry Burger at 6:30 pm.

Trustees present: Burger, Herman, Leonard (phone), Colgan (phone), Havertape (phone), Gifford (phone)

Trustees absent: Kramer

Visitors: None

Recording secretary: Shelley Kallenbach

Motion to approve the meeting agenda as posted made by Herman, seconded by Colgan, motion approved.

Motion to approve the December 15, 2016 meeting minutes made by Herman, seconded by Burger, motion approved.

Claims for payment were presented. Claims for a total of $12,432.99 for office electricity, internet, dam operations, printer maintenance, election expense, miscellaneous supplies, snow removal, lobbyist expense, trash removal, LP gas, and a storage shed were presented from the General Fund. Claims for a total of $123,757.94 for the final payout for both Phase I and Phase II construction were presented from the Dam/Spillway Project Fund. Colgan motioned to approve the payments as presented, Burger seconded, motion approved.

The financial reports were presented. The General Fund had revenues of $2,048.80 from Delaware County and interest, and expenditures of $45,902.74, ending December at $278,759.57. The Debt Service Fund had revenues of $3,897.31 and no expenditures, ending December at $185,445.88. The Dam/Spillway Project Fund had interest revenues of $1,250.25 and expenditures of $78,533.33, ending December at $1,725,085.92. Havertape motioned to receive and file the financial reports as presented, Herman seconded, motion approved.

Motion to set a public hearing to approve the FY 2017/2018 budget for March 2nd, 2017 at 6:30 pm made by Herman, seconded by Colgan, motion approved.

The Board considered possible action on Stanley Supplemental Agreements #47, 48, and 49. Supplemental Agreement #47 for $5,000 is for work done between October 1 and January 1, and takes care of remaining engineering services by Stanley for the flood event of September 22nd. Supplemental Agreement #48 for $2,500 is money already set aside for Stanley to provide information for the penalty clause settlement with GCI. Supplemental Agreement #49 relates to the soil boring work and closes out engineering services. These supplemental agreements close out payments done for work completed in 2016. Future work will require task by task authorization and could be completed by a different firm. Motion to approve Supplemental Agreements #47-49 made by Herman, seconded by Havertape, motion approved.

The Board heard committee updates.

The Beach Maintenance Committee states that Burrington Group is putting together a scope of services for the replacement of the riprap on Lost Beach prior to the disaster event. Project worksheets will then be made. Residents and involved parties will be consulted to seek a mutually agreeable way to handle storm water for preventing future problems, as well as seeking FEMA financing for preventative measures.

The Lake Recreational Maintenance Issues Committee had no updates.

The Dredge Committee had updates on the right of first refusal situation with the transfer of the dredge property to District ownership. After significant negotiation between both parties’ legal teams, the right of first refusal has been signed off, removing the remaining block for ownership transfer. This is important in the eyes of resolution with Homeland Security and FEMA to close out the projects.  The LDRA is aware and is working on it as it needs to be signed overs as quickly as possible.

The Dam Operations Committee states that after six weeks of winter operations and significant temperature swings, the dam has operated very well and maintained lake levels. The gates have automatically opened and closed once to maintain lake level. The new Gate #2 has been installed and operates well

The Water Quality Committee has been having success with the formation of the Watershed Authority, with close to 50% of the potential members signing on board with more meetings forthcoming. None have asked for changes.

The Funding/Finance Committee reminded the public of the public hearing for the 2017/2018 FY budget on March 2, 2017 at 6:30 pm.

The Legislative Committee states that the lobbyists are working on financing and are eager for more information regarding the Watershed Authority and the potential for additional funding this may make available.

A wrap-up meeting for the Celebration Committee will be planned to discuss the outcomes of the lake celebration. The Celebration Committee may be interested in discounts on future fireworks displays that come from scheduling in advance.

There was no public comment.

Motion to adjourn made by Herman, seconded by Burger. Meeting adjourned at 7:04 pm.

Trustee Agenda – Thursday, January 19, 2017

The Combined Lake Delhi Recreational Facility and Water Quality District

Thursday, December 15, 2016

6:30 p.m.

Lake Delhi Trustees Administration Building

Delhi, IA

 

  1. Call to Order
  2. Approve Agenda
  3. Consideration and approval of minutes of Previous Meetings
  4. Consideration and approval of Payments
  5. Review Financial Reports
  6. Consideration and possible action on establishing a date for a public hearing to approve the FY 2017/2018 budget
  7. Consideration and possible action on Stanley Supplemental Agreements #47, #48 and #49
  8. Committee Updates – Beach Maintenance, Lake Recreational Maintenance Issues, Dredge, Dam Operations, Water Quality, Funding/Finance, Legislative
  9. Public Comment
  10. Adjourn

Minutes – December 15, 2016

The Combined Lake Delhi Recreational Facility and Water Quality District

Thursday, December 15, 2016

6:30 pm

Lake Delhi Trustees Administration Building

Delhi, IA

The regular meeting of the Combined Lake Delhi Recreational Facility and Water Quality District was called to order by President Steve Leonard at 6:30 pm.

Trustees present: Leonard, Kramer, Herman, Burger with Colgan, Gifford, and Havertape participating by phone.

Trustees absent: None

Guests: Dan Ward from General Constructors, Inc., Chip Hughes, Ed Schmidt, and Deb Burger

Motion to approve the agenda as posted made by Burger, seconded by Herman. Motion carried.

Motion to approve the November 17, 2016 meeting minutes was made by Burger, seconded by Herman. Motion carried

Kramer presented payment claims for approval. Payments from the General Fund in the amount of $45,902.74 for electricity, supplies, internet/phone, copier usage, lobbyist, asphalt work, guardrail installation, electrical work, legal fees and engineering services were presented. Payments in the amount of $5,079.90 for dam operations, debris removal and engineering services were presented from the Dam/Spillway Project Fund. Motion to approve payments as presented made by Herman, seconded by Burger. Motion carried.

Kramer presented the financial reports for November. The General Fund had revenues of $4,396.76 and expenditures of $3,495.81 with an ending balance of $322,613.51. The Debt Service Fund had revenues of $8,265.21 with no expenditures with an ending balance of $181,548.57. The Dam/Spillway Project Fund had revenues of $1,398.52 and expenditures of $27,427.87 with an ending balance of $1,802,369.0. Burger motioned to file the financial reports as read, Colgan seconded. Motion carried.

Steve introduced Dan Ward from General Constructors, Inc.   Dan was present to discuss the late fees relating to the Phase II dam construction delays and Stanley Engineers recommendation as it relates to change order 10.5 that was signed in March.   Dan asked to be put on the agenda so he could explain his concerns regarding the project and the late fees with all the board members. He said his company was very grateful for the opportunity to be a part of the project. He acknowledged that this was for first dam project his company had ever been a part of but noted that his company does heavy civil work which is what this project was.   Dan said his main interest in the project was because he had friends who had a place on the lake and he was familiar with the area. When he saw the damage that was left from the breach of 2010 he felt compelled to help. From a timing standpoint his company also had the resources available so it made sense to bid the project.   He explained that the company left over a $1m dollars on the table. He did a lot of re-evaluating of his numbers but he said he felt comfortable with them and the plan for the project. He said the project got off to a good start until June 15th when the cofferdam broke. He said his company takes full responsibility for that but said they were able to work through it although it caused a month delay. That event was very instrumental that caused a lot of issues moving forward. The next setback they encountered was the unsuitable materials below the earthen embankment dam. They had to pay to have the unsuitable material removed and also had to bring more till in. It was difficult to find the right material and the quantity went up by 120%. That work pushed the project into the winter months. The wet weather during the winter months created many problems.   On December 14th the high flows almost breached the upstream cofferdam and they decided to open the gates and sacrifice the downstream cofferdam which flooded the work on the lower side. That created more delays.   In January, February and March there was very little progress.   Trying to install the till materials to 100% compaction was very difficult given the weather conditions. Once the weather broke things progressed quickly and the concrete work started moving forward. In March there was an agreement made to compensate the District for the engineering services provided by Stanley for the months of March and April plus liquidated damages for every day past May 1st. Dan stated his interpretation of “substantial completion” was defined as being able to pass water over the structure which he thought meant having the C & A slabs done. Then in subsequent discussions Bill Holman stated all the concrete work needed to be done before water could pass and then he also stated the cut-off wall needed to be done as well as fill around the sheet pile. The materials needed were changed to till material which caused a two week delay. Then the final definition of “substantial completion” was that the cofferedam needed to be removed and be inspected by the state. Dan felt the “substantial completion” definition was a moving target from the time of the initial agreement. The last obstacle was to get the cofferdam out of the water. Even though a two week extension was given to GCI, the delay caused the removal of the cofferedam to occur during a high water situation. In order to do that they mobilized more equipment and had to bring in more rock material to keep the equipment out of the water. Overall, the June failure of the cofferdam created more work, more overtime, more sub-contractor costs and more equipment costs. Dan said he felt his company did it’s best to get the dam project completed. In summary, Dan said the project was important to his company and they gave it special attention. He felt they provided the District with great value on bid day. He noted that they certainly underestimated the risk. He stated the cofferdam failure was their fault. But he noted that they had other existing issues that created the problems such as unsuitable materials. He said his company made the best effort they could to get the lake back. He felt the project started well and finished well because the lake is back. He understands that there were extra costs to the District with Stanley because of their delays and he accepts that but noted those costs were not close to the $1M that GCI gave us on bid day. Dan said he would accept whatever settlement on late fees that the Board felt is fair. Leonard thanks Dan for his information.

Leonard shared with the Board the information he was given by Bill Holman from Stanley Engineering regarding the additional costs to the District for the construction delays.   The total costs from March through July was $80,715.37. Leonard stated that Bill’s numbers are conservative and that these are the numbers Bill felt comfortable with.   Initially, Bill’s figures were in the $105,000 range. The $30,000 difference equates to 15 days at $2,000 per day which can be related to the two week delay that created issues dealing with the removal of the cofferdam. Colgan made a motion to reduced the retainage owed to GCI by $80,715.37, Kramer seconded the motion. Dan Ward asked that Stanley give him a change order based on the decision by the Board so that he can complete the contract and have an accurate paper trail. Leonard asked for comments from the Board. Colgan thanked Dan for coming to the meeting. He stated Phase II was not an easy project. He agreed with the timeline of that project that Dan presented.   Colgan agreed that Dan and his crew did the very job given the issues that were created by time delays. He also comments that we got great value for the project.   Burger asked for clarification on the retainage. Herman asked if we settle at $80,715 do we take the “substantial completion” out of the picture. Dan Ward stated the $2,000 /day was to cover Stanley’s costs. Leonard said he thought it was an arbitrary number. Colgan commented that it was his understanding the number came from taking Stanley’s average monthly bills and dividing them by 30 days to get to the $2,000 figure.   Dan stated the $80,715 is to cover the charges from Stanley. Herman stated that he felt with the quality bid we got and the quality project we got there should be no reason to go higher that the $80K. Gifford said he agreed with that figure. Havertape said he knows the project was frustrating and he felt comfortable with the settlement. Leonard acknowledged that the project was confronted with all kinds of issues including weather and soil compactions. The point of the settlement was to recoup our additional costs.   Kramer added that she attended the weekly construction meetings and saw firsthand the frustrations the crew was going through trying to get the right compactions through the winter months. She felt they did their very best and is extremely pleased with the outcome. Leonard added that by having Dan involved in the project it showed his commitment to getting the job done.  He was impressed by the additional time, energy, financial resources and commitment that Dan put into the project. Dan added that the quality of the project was very important to GCI. Colgan commented that the labyrinth spillway slopes six inches downstream and the water flows over uniformly. That was done perfectly. Leonard asked for a vote by the Board. All members voted to approve the motion.

Leonard asked Colgan to speak to the Board regarding the quote he received from Rotork on a spare gearbox/actuator. Colgan stated he’s been working with Rotork since last summer to come up with spare parts that the District would need to adequately insure operations 20 plus years into the future. He received their quote this past week and forwarded a copy to all the board members to review. Basically, there are three pieces of equipment that we need. A spare motorized actuator, spare gearbox and a spare threaded drive bushing. He explained how each piece of equipment works and why they are needed. The total cost is $38,265 which is one fraction of one percent of the total project. He stressed that it’s a 14-16 week delivery and the need for the parts is crucial because without them any problems we encounter in the future would cause multiple issues that we don’t want to have to deal with. Burger asked Colgan where the parts would be stored. Colgan stated he would recommend shipping them to Lunda since we have a service agreement with them through 2017. Eventually we would store in our facility but right now that area is not cleaned up and not suitable for storage. That is something we will need to address in the future. Burger made the motion to purchase the equipment from the Rotork quote for $38,265. A second to the motion was made by Herman.   Leonard asked for any other discussion. Herman asked about the shelf life of the equipment. Colgan said he felt they should be good for at least five years or more at which time we could send them back to be re-serviced if necessary. After more discussion regarding the gearbox Colgan stated that a service agreement with Rotork is being work out that would include inspection of equipment and repair work. Leonard asked for a vote. All ayes. Motion carried.

Leonard asked Colgan to highlight the next agenda item regarding a pay down of the Lunda Construction retainage.   Our current retainage is around $120,000 which we’ve held for over 18 months. The issue has always been the gate we just talked about. Now that we can quantify what’s left which is under $15,000 worth of work we should be able to release some retainage.   Bill Holman has given us his recommendation and an invoice from Lunda for the release of $73,453.43. Colgan suggested we hold off until January and resolve the retainage at our next meeting. Kramer explained that we have a specific invoice for the $73,453.43 and suggested we should pay that amount this month.   It was again noted the only thing left for Lunda is to finish the gate work so paying this invoice still gives us a cushion of around $50,000. A motion was made by Herman, second by Burger to approve the partial payment release of $73,453.43. Motion carried.

Leonard asked Kramer to present information relating to the next agenda item concerning closing out the current Stanley Consultants supplemental agreements and move towards a “service as requested” agreement. Kramer indicated that at the time Stanley was hired as our dam engineering firm specific tasks were developed relating to different aspects of the rebuilding process. Now that the project is almost complete there’s little invoicing left from Stanley that relates to the dam rebuild.   Kramer has talked with Bill Holman from Stanley and he indicated that there’s some invoices left that relate to Phase II but it would appear that once those are paid we can close out the project with Stanley and move to a “service as requested” agreement which would mean as projects develop that we need their services they would quote as an amount per project. Leonard mentioned that Kramer as well as himself have had conversations with our county auditor, Carla Becker, who would like to see us move to closing out the project which includes not only Stanley but Lunda and GCI as well. Kramer also mentioned that once the closeout is complete we will be able to move the remaining funds from our Dam Spillway Fund into our General Fund as it was a sub-fund of the General Fund from the beginning. Burger asked if the Board will have discussions regarding any service agreement with Stanley before they are hired to do any other projects for the District. Leonard stated that is correct. What makes sense is to clean up the current contract and start fresh with agreements for projects that don’t relate to the rebuild project. Kramer asked Colgan to explain some projects he’s aware of that will need attention from Stanley. He stated that one project is the damaged done to the downstream riprap from the September 22 flood than needs to be re-done. FEMA may be involved in the project but it’s work that needs to be done in 2017. Another project is the erosion problems we have near the SCADA building on the south side of the dam. Leonard stated that we know there will be areas around the dredge site that Stanley is going to be involved in. Leonard said to answer Burger’s question he thinks it would be important for the Board to make a master list of projects that need Stanley’s services and then put a contract into place for each project with a “not to exceed” dollar amount.   Kramer indicated the actual close out with Stanley for the dam rebuild will occur in January and after that the Board can look at service agreements with Stanley for future projects as needed. No action on this agenda item was taken.

The next agenda item was regarding a possible change in the monthly meeting date. Gifford stated that since we’ve had our meetings on Thursday for years and since some times family events fall on Thursday nights he thought maybe we could change the date. Kramer expressed concerns that Monday and Tuesday nights are not particularly good nights and that she would like the meetings to remain in the third week of the month because she has to prepare the financial reports after she receives them from the county and that usually happens in the second week of the month.   Both Herman and Burger stated that Monday and Tuesday nights are their busy nights because of business meetings. Burger suggested that possibly we could hold the meetings on a Wednesday or Thursday depending on schedules. Leonard suggested the possibility of have the meetings on a six month rotation where the first six months the meetings are on Wednesday and the second six months they would be on Thursday.   Kramer said she feels people have an expectation that our meetings will be on a certain day of the month. Herman agreed. With no motion made, there was no action.

Committee Updates:

Beach Maintenance – Leonard asked Herman to give a brief update regarding recent discussions with FEMA. Herman stated there are three or four potential projects that the District could look at based on the 2016 flood. One of those projects includes Lost Beach. Herman stated that he has met with FEMA representatives several times and they have been to the area to review and take pictures. They agree we are eligible for funds because it is a public beach. They would put together a project to restore the beach at 75% cost to FEMA, 15% District and 10% state. They also stated that if the District could provide them information that this could be a reoccurring type of damage and present to the them a proposal called a “hazard mitigation” project we could possible get additional funding for protective measures around the beach. Herman stated it would be nice to include some sedimentation catch although he does not know if FEMA would consider that as part of flood prevention. Herman said he has talked with Burrington Group because we will need their help in putting together the scope of the project. Leonard asked if there needs to be three bids. Herman stated we aren’t required to have three bids but it would be best if we did that or evidence that we sought other bids. Herman mentioned other projects that might be eligible for FEMA funds include debris removal. There’s debris sitting on the spillway and there’s debris below the spillway. If the overall cost is $3,000 or more we could possibly get some fund. The money spent having experts on the dam the day of the flood event falls into a “protective” measures category and we may be eligible to be reimbursed for those costs. Another project could be the work done to pull out the riprap after the flood event. They would pay us back for that because the work was done as an emergency protection measure even though we didn’t bid it because the work needed to be done right away. We could potentially look at funding to re-do the riprap if we could get a scope of the project and bids.   Leonard asked Herman if he was wanting guidance from the Board to get Burrington Group involved in putting together a scope of services for the Lost Beach project and Stanley Engineering for the riprap project. Herman stated he needs direction from the Board to getting moving in the next few weeks. The general concensus was to have Herman move forward to organize what is needed to move forward.  Burger expressed concern that the Board needs to work with the private landowners.

Lake Recreational Maintenance Issues – No report

Dredge – No Report

Dam Operations – Colgan commented that the bubblers are working on the dam and we will be watching for spring runoffs in the future

Water Quality – Leonard said December and January regarding the Watershed Management Authority. There’s a total of 58 eligible members including cities, counties, soil water conservation districts, etc.   Things are moving well and hoping to get a large grant in the near future

Finance/Funding – Kramer reported that she has picked up the budget worksheets for our next fiscal year and will be starting the process to build next year’s budget after the holidays.

Legislative – Leonard mentioned that we are working to get adjusted language approved to help us with the refund of bonds and that our lobbyists are working on this along with Lee Hein and Dan Zumbach.

Public Comments:

Chip Hughes said he found it interesting that there was a statement made there was flood damage done to Lost Beach. He wasn’t aware of the damage.

Ed Schmidt said he noticed that in the Manchester Press there are grants available through the Future Foundation of Delaware County and was wondering if that is something the District could participate in. Kramer stated that she thought you needed to be a non-profit organization to get grant money but would check into it.

Motion to adjust by Burger, second by Kramer. Motion carried. Meeting adjourned at 8:10 p.m.

Trustee Agenda – Thursday, December 15, 2016

The Combined Lake Delhi Recreational Facility and Water Quality District

Thursday, December 15, 2016

6:30 p.m.

Lake Delhi Trustees Administration Building

Delhi, IA

 

  1. Call to Order
  2. Approve Agenda
  3. Consideration and approval of minutes of Previous Meetings
  4. Consideration and approval of Payments
  5. Review Financial Reports
  6. Presentation by Dan Ward from General Constructors, Inc. regarding Phase II late fees
  7. Consideration and possible action on a settlement of late fees with General Constructors, Inc.
  8. Consideration and possible action on Rotork Quote for spare gearbox/actuator
  9. Consideration and possible action on pay down of Lunda Construction retainage
  10. Consideration and possible action on closing out the current Stanley Consultants supplemental agreements and move towards a “service as requested” agreement for 2017
  11. Consideration and possible action on changing the monthly meeting date of the Board of Trustees
  12. Committee Updates – Beach Maintenance, Lake Recreational Maintenance Issues, Dredge, Dam Operations, Water Quality, Funding/Finance, Legislative
  13. Public Comment
  14. Adjourn

Minutes from November 17, 2016

The Combined Lake Delhi Recreational Facility and Water Quality District

Thursday, November 17, 2016

6:30 pm

Lake Delhi Trustees Administration Building

Delhi, IA

 

The regular meeting of the Combined Lake Delhi Recreational Facility and Water Quality District was called to order by President Steve Leonard at 6:35 pm.

Trustees present: Leonard, Kramer, Burger with Colgan, Gifford, Herman and Havertape participating by phone.

Trustees absent: None

Guests: Randy Rattenborg

Motion to approve the agenda as posted made by Burger, seconded by Kramer. Motion carried.

Motion to approve the October 20, 2016 meeting minutes and October 27, 2016 work session notes was made by Colgan, seconded by Burger. Motion carried.

Kramer presented payment claims for approval. Payments from the General Fund in the amount of $3,619.82 for electricity, supplies, internet/phone, copier usage, port-a-potty rentals, lobbyist, insurance and software license were presented. Payments in the amount of $27,427.87 for dam operations, riprap work, and engineering services were presented from the Dam/Spillway Project Fund. Motion to approve payments as presented made by Herman, seconded by Kramer. Motion carried.

Kramer presented the financial reports. The General Fund had revenues of $19,478.76 and expenditures of $27,539.99 ending October at $321,712.56. The Debt Service Fund had revenues of $36,406.86 and expenditures of $110,138.75 ending October at $173,283.36. The Dam/Spillway Project Fund had revenues of $1,411.02 and expenditures of $345,766.24 ending October at $1,828,398.35. Burger motioned to file the financial reports as read, Leonard seconded. Motion carried.

Colgan presented information regarding riprap options resulting from the September 2016 flood event.   He indicated that due to the heavy rains from the September event, the riprap on the north downstream side was dislodged.   With the exposed concrete walls that were uncovered this fall, the need for the riprap has changed. Colgan is working with the DNR to see if the District can extend the riprap further downstream. Since this is DNR property approval would require a permit from them and we may or may not get that approval. The cost to move the riprap would be approximately $17,000.   If we have to remove the riprap the cost could increase significantly to approximately $40,000 to $60,000. Colgan said the work isn’t critical to the operations of the dam but it is work that will need to be taken care of sometime in early 2017.     Leonard asked if there was a need for riprap on the south side upstream area. Colgan said there is not need for riprap in that area. Colgan stated no action was needed tonight. This was information to bring the Board up-to-date.

Leonard made a presentation regarding the Watershed Management Authorities that he worked on with both Gifford and Herman. He mentioned that there had been talks in the past about funding sources that can be utilized for watersheds. Larry Murphy, one of our lobbyists, brought this to the Board’s attention some time ago and since then there have been 7-10 meetings with key stakeholders around the area including Delaware County, Delaware Co. Conservation, City of Monticello, Jones Co. Supervisors, etc.   Leonard stated that there have been twenty watershed authorities already established in the state of Iowa. We would be the 21st, which would cover the entire Maquoketa River area including all the way from Arlington down to the Mississippi River.   Our partners throughout this process have been the Department of Agriculture at the federal level, the NRCS, the IDNR and other key stakeholders including cities and counties in the surrounding areas with Lake Delhi really driving the process. There’s been a hired employee that is part-time position that works with the different watershed authorities to help get us through the process to get watersheds established.

He explained that Maquoketa Watershed Authority is a locally led team driving financial and social benefits through sustainable water resource quality and conservation for urban and rural residents in the Maquoketa River Watershed. The Maquoketa River Watershed Management Authority will work hard to create and implement tangible high ‘return on investment’ projects with maximum funding assistance for its members – that make this WMA a key component of every member’s development resources.

A lot of the funding will be driven from federal dollars that will go to the State of Iowa. The MWA would then apply for grants from the state. However, Leonard also said funding could come from the various participants in the watershed authority including the Lake Delhi District, other counties and cities depending on the level of funding requirements. We all have a value up and down the Maquoketa River to have high water quality and to minimize flooding.

Leonard stated that the District needs to make a decision either tonight or at the December meeting whether or not to enter into a 28E agreement for membership into the Maquoketa River Watershed Management Authority because starting in January, 2017 this watershed authority will be kicking off, regardless of the number of participants, due to the fact that there’s money that is going to be earmarked for watershed authorities that are in the beginning stages of forming and could be in the neighborhood of $100,000 that could go toward significant studies of our watershed. We are one of two new management authorities being forms so we stand a good chance of getting some financial assistance right away. Leonard stated that the incentive to participate in this program is that there’s power in numbers.

Areas impacted surface and ground waters, flooding, recreational areas, soil erosion, environmental areas, natural habitats, water protection to name a few.

The structure is a 28E Agreement. There’s no financial obligation for any organization to participate, however, there will be financial requirements and needs as the authority moves forward. Our lobbyists are excited to participate and help lobby for funds at the state level. If the District directs our lobbyists to do that, it could be considered a part of our contribution to the group. There will be a board of directors formed. Each entity gets one vote. There will also be an executive committee that will do a lot of administrative and legal work. Several slides were presented showing the creeks that flow into the Maquoketa River. It also shows areas of erosion and siltation in our watershed.   The NRCS has done some work previously but more studies are needed.   That is why getting funding would help with further studies.

Leonard stated that if we choose to move forward with the 28E agreement it will give the District one vote within the group. He cautioned that by not participating it would make it extremely difficult for the District to get support for local initiatives.

Leonard asked for comments from Gifford and Herman. Herman stated that this agreement positions as very well for funding. If in the future, the Board decides it no longer wants to participate, it can get out. Herman stated he feels we have more to gain than lose by participating.

Leonard asked the Board to consider formally approving the 28E Agreement. Burger stated he had some questions. His expressed concern that if we approve at tonight’s meeting and other participants review the agreement and make changes we would have to go through another approval process. Herman said that was true but there was input from various groups and this document was streamlined. In addition, because of time constraints it was felt necessary to go ahead with the process. Burger asked if there’s enough time to send out to the other participants to make sure they have their legal counsel review and bring back any changes right away. Burger also asked about liability issues. Herman doesn’t disagree but he thinks we are a long way from being in that situation. Adding by-laws in the future could help address those concerns. Burger asked if the District representative would have the authority to obligate the District to a grant that required matching funds. Leonard and Herman said their understanding is that the District’s representative could not obligate the District to matching funds without the consent of the Board of Directors. Burger would like to have a presentation at the December meeting to see how many other participants have signed the 28E Agreement and if there are any suggested changes to the agreement.

Leonard asked for a motion to approve Resolution 11.17.16 authorizing him to sign the 28E Agreement as presented. Herman asked if Leonard was offering to be the representative for the District. Leonard said he would be the initial representative but that could change depending the interest of any other board member. Herman made the motion to approve the resolution authorizing Leonard to execute the initial 28E Agreement with the understanding that Leonard would be the initial representative of the District. A second was made by Havertape. Burger suggested and it was agreed that we should assign a representative/s annually at our August organizational meeting.   Motion carried.

Committee Updates:

Beach Maintenance – Leonard has been in contract with Rich Hughes. Rich has some numbers put together for beach repair and work that would help mitigate water flow. There are no specifics at this point.

Lake Recreational Maintenance Issues – Gifford and Leonard contacted local marinas to see if they could help with debris removal in various parts of the lake. The two local marinas are not interest but Jeremy Klima who works with a Dubuque marina that has heavy equipment used for debris removal, might be interested.   Jeremy was going to tour the lake area this coming weekend and give Leonard an estimate of what he thought it would cost to do some debris removal.

Dam Operations – Lunda reinstalled Gate 2. It does leak oil but the stem and bearing are working. We may be looking at options to make it work better.   He also indicated that Lovewell has installed the new guardrail on the north side and that the asphalt work has also been completed.   He also mention the sealcoating on the powerhouse is done and the bubbler system is ready to go. Leonard asked Colgan about the block path on the south downstream side.   It appears to be complete on the bottom portion but not on the hill itself.   Colgan’s understanding that it was never intended to go all the way up but that’s a question for Bill Holman. Leonard asked Colgan if he would confirm.

Water Quality – No other updates

Funding/Finance – Budget work for the 17/18 year will be starting soon.

Legislative Update – Leonard will get our lobbyists to give us an update with all the changes at the state level.

Herman noted that he would be attending a FEMA meeting in Manchester on Monday, November 21 to review the damages from the recent flood

Burger motioned to adjourn the meeting, Kramer seconded. Meeting adjourned at 7:27 pm.

Trustee Agenda – Thursday, November 17, 2016

The Combined Lake Delhi Recreational Facility and Water Quality District

Thursday, November 17, 2016

6:30 p.m.

Lake Delhi Trustees Administration Building

Delhi, IA

 

  1. Call to Order
  2. Approve Agenda
  3. Consideration and approval of minutes of Previous Meetings
  4. Consideration and approval of Payments
  5. Review Financial Reports
  6. Discussion regarding downstream rip-rap options resulting from the September, 2016 flood event
  7. Presentation by Steve Leonard/Todd Gifford/Doug Herman about Watershed Management Authorities
  8. Consideration of approval for resolution approving 28E Agreement to participate in Maquoketa River Watershed Authority
  9. Committee Updates – Beach Maintenance, Lake Recreational Maintenance Issues, Dredge, Dam Operations, Water Quality, Funding/Finance, Legislative
  10. Public Comment
  11. Adjourn

Work Session – October 27, 2016

The Combined Lake Delhi Recreational Facility and Water Quality District

Board of Trustees Work Session

Thursday, October 27, 2016

3:00 p.m.

Lost Beach

 

A work session was called to order by President Leonard at 3:00 p.m.

Trustees present: Leonard, Colgan, Gifford, Kramer, Burger and Havertape

Trustees absent: Herman

Visitors: Jason Wenger from Burrington Group, Rich Hughes, Chip Hughes, Dave Larson and Howard Wood

The trustees discussed the damage done to Lost Beach after the last heavy rainfall and possible options to prevent damage in the future. No action was taken. Gifford motioned to adjourn at 3:30 p.m., second by Colgan. Meeting adjourned.

Minutes from October 20, 2016

The Combined Lake Delhi Recreational Facility and Water Quality District

Thursday, October 20, 2016

6:30 pm

Lake Delhi Trustees Administration Building

Delhi, IA

The regular meeting of the Combined Lake Delhi Recreational Facility and Water Quality District was called to order by Vice President Todd Gifford at 6:30 pm.

Trustees present: Kramer, Gifford, Colgan, Herman, Havertape, Leonard (phone), Burger (phone)

Trustees absent: None

Recording secretary: Shelley Kallenbach

Guests: Larry Peter, Eve Peter, Ed Schmidt, Jim Locke, Donald Dede, John Carbaugh, Becky Willey, Jim Willey, Ken DeKlotz, Barb DeKlotz, Dan Reyner, Chloe Colgan, Jen Colgan, Chip Hughes, Dan Recker, Larry Aschbrenner, Mike Russell

Motion to approve the agenda as posted made by Herman, seconded by Havertape, motion approved.

Motion to approve the September 15, 2016 meeting minutes made by Gifford, seconded by Herman, motion approved.

Kramer presented payment claims for approval. Payments from the General Fund in the amount of $4,428.40 for electricity, supplies, internet/phone, bond registrar, lobbyist, signage, and labor for a generator backup system were presented. Payments of $110,138.75 for the GO bond interest were presented from the Debt Service Fund. Payments in the amount of $345,766.24 for dam operations, Phase 2 payments, and engineering services were presented from the Dam/Spillway Project Fund. Motion to approve payments as presented made by Havertape, seconded by Colgan. The interest is for the district’s bond debt and the principal payment is due in June. Motion approved.

Kramer presented the financial reports. The General Fund had revenues of $94,693.15 and expenditures of $20,892.28, ending September at $329,773.79. The Debt Service Fund had revenues of $172,784.18 and no expenditures, ending September at $247,015.25. The Dam/Spillway Project Fund had revenues of $1,614.91 and expenditures of $80,337.07, ending September at $2,175,592.35. Herman motioned to file the financial reports as read, Gifford seconded. An estimate of what remains to be paid includes a payment of approximately $200,000 to Lunda and the GCI settlement. Motion approved.

The Board considered possible action on Stanley Supplemental Agreement #44. This is in reference to holding up to $3,000 for the ongoing issues with Gate 2 to be held until the new Gate 2 is complete and installed. Kramer motioned to approve, Havertape seconded, motion approved.

The Board considered possible action on Stanley Supplemental Agreement #45. This is a placeholder in the amount of $2,500 for remaining items necessary to close out the Phase 2 contract. It is to cover excess expenditures should they happen. Herman motioned to approve, Kramer seconded, motion approved.

The Board considered possible action on Stanley Supplemental Agreement #46. This is for professional services to set up information on the webpage for flood awareness not to exceed $10,000. Colgan motioned to approve, Havertape seconded. This is in anticipation of future work necessary and will still have a review process to be accessed, including a letter of proposal and bids. Motion approved.

The Board considered possible action on the LDRA donation request for assistance with the LDRA dredge debt. This is a request for the December 2016 dredge interest loan payment of $23,146.00. Kramer motioned to approve, Burger seconded, motion approved.

The Board considered possible action on a proposal from Kluesner Construction for asphalt work on the north side of the dam. This was the only bid received for this work due to the timeframe. Leonard attempted to get a 2nd bid from a large contractor but was told that it would be difficult to have them come out for a bid anytime soon let alone actually do the work this year. The amount of the bid is for $4,950 and includes using a highway mix concrete to pave the north U-shaped dam to the fence to allow for blacktopping. Kramer motioned to approve Kluesner’s bid, Gifford seconded. It was confirmed that this was appropriate pricing and not inflated due to the timeframe. Motion approved.

The Board considered possible action on a proposed drainage study from Burrington Group regarding Lost Beach. Lost Beach sustained damage after both of the recent rainfalls. This has become a major watershed with many property owners and developers invested. Because of this, it was suggested to have a study survey the water flow and the options to mitigate future damage prior to fixing it outright. This study would be done by Burrington Group and they would review existing data as well as new observations. Motion to approve an hourly rate fee for this study with a total not to exceed $5,400 for such a study made by Herman, seconded by Havertape. Burger expressed concerns about making sure the study does not negatively impact or blame watershed on Hughes, as well as the possibility that a simple fix may be used. It was discussed that until a study is complete it is difficult to know if a simple fix will be sufficient going forward. Herman stated that he feels tabling this study is a good idea because he believes that some of the runoff is the responsibility of the developers and he is not sure that the Board needs to solely pay for such a study. Burger motioned to table a decision on the study and put it on the agenda for next month after research, Havertape seconded, motion to table approved. Leonard will coordinate a posted walkthrough of the area for board members.

The Board considered possible action on a recommendation for the GCI overrun settlement. The majority of the GCI work is complete but the Board has been holding retainage until an agreement is made between the Board and GCI for the late completion date. Bill Holman has recommended an agreement based on the assessed value of $105,982.85. Leonard is seeking an estimated payment amount for the Board to use before entering negotiations with GCI for settlement. $130,000 is currently retained. Gifford motioned to approve the amount of $105,982.85 to begin discussion, seconded by Colgan. Discussion was made whether a range approval was necessary for Leonard to enter into discussion. Motion amended to allow Leonard to negotiate and return with a proposed number if it is anything lower than Stanley’s recommendation. Motion approved.

The Board considered possible action on a Procedure and Policy Guide for hiring individuals to address significant lake debris or obstructions. Gifford suggests that a policy would be important to prevent needing a Board meeting every time there is significant debris or obstruction necessary to be removed immediately for lake safety. Gifford motioned to create a policy and procedure based on the draft he presented, Colgan seconded. Burger expressed concerns about the liability and insurance checks for potentially hired assistance. Concerns were also expressed about potential damage to private property. The timeline for this concern was discussed due to the potential for hazards to snowmobilers that would not be visible due to snow cover. A new motion was made by Herman to table the policy and procedure and to use the current ability to hire staff using existing procedures up to $5,000 to care for emergent items, Havertape seconded, motion approved.

The Board heard committee updates.

The Beach Maintenance Committee states that we are aware of what happened to Lost and North Beaches and the need to assess the damage. The port-a-potties will be out before the end of October.

The Lake Recreational Maintenance Issues Committee had no updates.

The Dredging Committee stated they will have more information from Bill Holman regarding a siltation trap and its cost for the next board meeting.

The Dam Operations Committee presented updates. Colgan stated that the dam controlled all gate operations throughout the entire flood. The water flow went from 500 cfs to 16,000 cfs overnight. Gates 1 and 3 opened a total of 12 feet, and Gate 2 was opened manually to 6 feet. It was reiterated that the dam is not a flood control dam, but is a run of the river dam. The dam operated exactly as designed throughout the flood.

The Water Quality Committee is looking to do water quality testing in the spring and also participating in the Maquoketa Watershed Management Authority.

The Funding and Finance Committee did increase the dam office contents to include the SKATA computer.

Shrubs have been taken out at the dam office area along with a new window, new carpet, and new toilet to be installed in the near future. The prairie grass project has been postponed until spring due to the ragweed going to seed.

The Legislative Committee stated the DNR has declined the request to put Lake Delhi on the Public Lake list and be eligible for the lake restoration funds.   The legislative committee will work on this in the new session.

The floor was opened for public comment.

Chip Hughes stated that there was no beach damage to Lost Beach that has not occurred during previous rainfall events. He stated that he did repair the 3-inch rain damage as in the past. He stated the DNR does not require a change in watershed runoff and that is a municipality requirement. He stated the DNR permitting has to do with erosion and not runoff. He offered to join any meeting to review the area to explain and offer simple changes.

A question was raised regarding the usefulness of the lobbyists. It was reiterated that they are still involved in funding and FEMA issues and they are intended to help these issues resolve easier, but they are reviewed regularly for their usefulness.

Larry Peter requested a louder speaker system. He will also be sending safety discussion information to the Board.

A request was made for more FEMA updates. Herman stated that deadlines are nearing and issues continue to exist with the Harbach property and ownership of the LDRA transfer.

Dan Reyner stated that the boatlift issue n the lake was resolved.

Herman motioned to adjourn the meeting, Colgan seconded. Meeting adjourned at 8:23 pm.

Minutes from September 15, 2016

The Combined Lake Delhi Recreational Facility and Water Quality District

Thursday, September 15, 2016

6:30 pm

Lake Delhi Trustees Administration Building

Delhi, IA

 

The regular meeting of the Lake Delhi Recreational Facility and Water Quality District was called to order by President Steve Leonard at 6:33 pm.

Trustees present: Kramer, Leonard, Gifford, Havertape, Colgan

Trustees absent: Burger, Herman

Visitors: Chip Hughes, Jason Wenger, Don Dede, Jim Locke, Chloe Colgan, Donna Kunde, Larry Aschbrenner, John Zietlow

Recording secretary: Shelley Kallenbach

Motion to approve the agenda as read was made by Havertape, seconded by Kramer, motion approved.

Motion to approve the August 18, 2016 meeting minutes as posted made by Colgan, seconded by Gifford, motion approved.

Kramer read the payments. Payments in the amount of $20,956.06 for electricity, maintenance and supplies, asbestos inspection, lobbyist, safes, signage, office rent, insurance, internet, and LP gas were presented from the General Fund. Payments in the amount of $80,337.07 for dam operations, Phase 2 work, closing the service gates, engineering services, and fire extinguishers were presented from the Dam/Spillway Project Fund. Motion to approve the payments as read made by Havertape, seconded by Colgan. It was confirmed that it is possible to combine funds in the future. Motion approved.

Kramer read the financial reports. The General Fund had revenues of $24,239.77 and expenditures of $4,740.51, ending August at $255,972.84. The Debt Service Fund had revenues of $45,288.87 from Delaware County and no expenditures, ending August at $74,231.07. The Dam/Spillway Fund had revenues of $1,761.66 from interest and expenditures of $52,114.29, ending August at $2,254,314.51. Motion to file the financial reports as read made by Gifford, seconded by Colgan. The need for an October planning meeting for next fiscal year’s budget was discussed. Motion approved.

The Board considered possible action on quotes for a holding tank for the former LDRA building, now used as the Dam Office. The existing tank does not meet requirements for separation from the property. Proposals for a 1,500-gallon holding tank northwest of the building meeting the 200 feet separation requirements were solicited. Three quotes were received: Oasis Plumbing for $3,829.00, Mark Fink for $4,090.00, and Groth Services $4,530.00. It was confirmed that the quotes were for equal work and more could be added to this tank if future needs required. It is believed that Oasis can complete this before the end of October. Kramer motioned to approve the Oasis quote at $3,829.00, Gifford seconded, motion approved.

Action on the south slope of the dam agenda item was moved until John Zictlow arrived at the meeting.

The Board considered action on guardrail work. Colgan states that a guardrail is required on the north side of the dam to allow for a snowplow in winter. A quote was obtained for $4,800 from Lovewell Fencing, the usual company used for this type of work. One Call must also be contacted, and then the guardrail will be installed in about the next week. This will be a first step toward preventing unauthorized access at that point, as well. Kramer motioned to approve, Havertape seconded, motion approved.

Colgan made the Board aware of maintenance on asphalt work on the north end of the dam. This will be work inside the fence and will be one of the last things required to be done. No approval was sought at this time.

The Board heard committee updates.

The Beach Maintenance Committee states that Randy Rattenborg has come to survey the property. He has finished Lost Beach and is working on North Beach and other areas. Kramer and her husband have been monitoring trash cans on Lost Beach. Rich Hughes and Chip Hughes have been very active with maintenance on Lost Beach and it looks incredible. The Committee will be sitting down with Chip to make a maintenance plan for Lost Beach for the rest of the year and next year. This will include discussion on the Porta-Potty situation.

The Lake Recreational Maintenance Committee states that they are working on getting the property fully surveyed because it was not all originally marked. An email will also be sent out soliciting volunteers to assist with dam office upkeep work.

The Dredging Committee states that Stanley has put together a comprehensive plan related to dredging. Their main recommendation is to build as soon as possible a siltation trap near the Cedars.

Colgan of the Dam Operations Committee states that June 24th was the day the gates were closed, and on August 21st water was flowing over the spillway. The gates have been fully closed since. The lake level is based on water flows. Currently it is at its lowest operating point and could go between 4 to 5 inches higher as flows increase, and the gates will not be lifted until it reaches 7/10ths of a foot higher, which would require flows of near 500 cfs.

The Water Quality Committee states that it is working with Mary Skopek with the DNR/Iowater to start the water quality process back in action. He is working on a date for a workshop to train volunteers to test 10 points once a month and after major water events. He is looking for 15-20 water testers. Testing would take about 10 minutes a spot. Also, he highly recommends viewing the Turtle Creek Cove area as the project is nearly complete and the DNR has been very impressed with their proactive work.

The Funding/Finance Committee had no updates.

The Legislative Committee states it will be meeting next week with legislators to discuss ongoing initiatives.

The Board considered possible work on the south slope of the dam near the next fencing. John Zictlow and Donna Kunde offer to start a native prairie at this position, which would be both aesthetically pleasing and also supportive of water quality measures. Zictlow presented a proposal for seed to obtain and methods on how to begin this native prairie. This would include killing the existing plant life, mowing the stubble, and planting the seed this year. This project would be a 5-year project as it would take 5 years for the plants to fully produce. Only minor mowing work would be required the first and second years. These plants have a deeper root system and will hold soil to help prevent runoff and improve water quality. Zictlow offers to be the project manager and will not charge for the time to manage and work the project. Kramer motions to approve John Zictlow for no more than $1,000 for a native prairie project on the south slope, Colgan seconded, motion approved.

The floor was opened to public comment.

Chip Hughes states that he intentionally held back one load of stone on Lost Beach and the work there has been completed. He expressed concern that someone used Roundup on trees that were growing on Lost Beach. He states that there is no liability on thorns or thorn material and urges the Board to consider keeping thorny bushes on Lost Beach intact.

Jim Locke requests an update on FEMA and that it be on the agenda for next month.

Larry Aschbrenner asks if a guardrail will be adequate to prevent unauthorized access. It was stated that this will be the first step, but an additional fence can be added along with no parking signs should unauthorized access continue.

Motion to adjourn the meeting made by Gifford, seconded by Colgan. Meeting adjourned at 7:42 pm.